Advances in Production Management Systems: Competitive Manufacturing for Innovative Products and Services IFIP WG 5.7 International Conference, APMS 2012 Rhodes, Greece, September 24-26, 2012, Part I
Conference papers
Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations
Abstract : We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona.
https://hal.inria.fr/hal-01472270
Contributor : Hal Ifip <>
Submitted on : Monday, February 20, 2017 - 4:14:34 PM Last modification on : Monday, November 16, 2020 - 3:56:03 PM Long-term archiving on: : Sunday, May 21, 2017 - 3:22:47 PM
Joaquín Bautista, Rocío Alfaro, Alberto Cano. Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations. 19th Advances in Production Management Systems (APMS), Sep 2012, Rhodes, Greece. pp.405-412, ⟨10.1007/978-3-642-40352-1_51⟩. ⟨hal-01472270⟩