M. Van-den-akker and H. Hoogeveen, Minimizing the number of late jobs in a stochastic setting using a??chance constraint, Journal of Scheduling, vol.15, issue.1, pp.59-69, 2008.
DOI : 10.1007/s10951-007-0034-8

C. L. Chen and R. L. Bulfin, Complexity of single machine, multi-criteria scheduling problems, European Journal of Operational Research, vol.70, issue.1, pp.115-125, 1993.
DOI : 10.1016/0377-2217(93)90236-G

C. A. Coello, G. B. Lamont, and D. A. Veldhuizen, Evolutionary Algorithms for Solving Multi-Objective Problems (Genetic and Evolutionary Computation, 2007.

K. Deb, Multi-Objective Optimization using Evolutionary Algorithms , 1st edn. Wiley-Interscience Series in Systems and Optimization, 2001.

K. Deb, S. Agrawal, A. Pratab, and T. Meyarivan, A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II, Proceedings of the Conference on Parallel Problem Solving from Nature, pp.849-858, 2000.
DOI : 10.1007/3-540-45356-3_83

J. Durillo, A. Nebro, and E. Alba, The jMetal framework for multi-objective optimization: Design and architecture, IEEE Congress on Evolutionary Computation, pp.4138-4325, 2010.
DOI : 10.1109/CEC.2010.5586354

P. F. Dutot, K. Rzadca, E. Saule, and D. Trystram, Introduction to Scheduling, Multi-Objective Scheduling, pp.219-251, 2010.

M. Emmerich, N. Beume, and B. Naujoks, An EMO Algorithm Using the Hypervolume Measure as Selection Criterion, Proceedings of the International Conference on Evolutionary Multi- Criterion Optimization, pp.62-76, 2005.
DOI : 10.1007/978-3-540-31880-4_5

M. R. Garey and D. S. Johnson, `` Strong '' NP-Completeness Results: Motivation, Examples, and Implications, Journal of the ACM, vol.25, issue.3, pp.499-508, 1978.
DOI : 10.1145/322077.322090

R. L. Graham, Bounds on Multiprocessing Timing Anomalies, SIAM Journal on Applied Mathematics, vol.17, issue.2, pp.416-429, 1969.
DOI : 10.1137/0117039

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.90.8131

R. L. Graham, E. L. Lawer, J. K. Lenstra, and A. H. Kan, Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics, vol.5, pp.287-326, 1979.
DOI : 10.1016/S0167-5060(08)70356-X

C. Grimme and J. Lepping, Designing Multi-objective Variation Operators Using a Predator-Prey Approach, Proceedings of the International Conference on Evolutionary Multi-Criterion Optimization, pp.21-35, 2007.
DOI : 10.1007/978-3-540-70928-2_6

C. Grimme, J. Lepping, and A. Papaspyrou, Exploring the behavior of building blocks for multi-objective variation operator design using predator-prey dynamics, Proceedings of the 9th annual conference on Genetic and evolutionary computation , GECCO '07, pp.805-812, 2007.
DOI : 10.1145/1276958.1277119

H. Hoogeveen, Multicriteria scheduling, European Journal of Operational Research, vol.167, issue.3, pp.592-623, 2005.
DOI : 10.1016/j.ejor.2004.07.011

J. R. Jackson, Scheduling a Production Line to Minimze Maximum Tardiness, Management Science Research Project Research Report, vol.43, 1955.

J. Knowles and D. Corne, Approximating the Nondominated Front Using the Pareto Archived Evolution Strategy, Evolutionary Computation, vol.8, issue.2, pp.149-172, 2000.
DOI : 10.1109/4235.797969

M. Laumanns, G. Rudolph, and H. P. Schwefel, A spatial predator-prey approach to multi-objective optimization: A preliminary study, Proceedings of the Conference on Parallel Problem Solving from Nature, pp.241-249, 1998.
DOI : 10.1007/BFb0056867

J. M. Moore, Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs, Management Science, vol.15, issue.1, pp.102-109, 1968.
DOI : 10.1287/mnsc.15.1.102

M. Pinedo, Scheduling: Theory, Algorithms, and Systems, 2009.

H. P. Schwefel, Evolution and Optimum Seeking, 1995.

W. E. Smith, Various optimizers for single-stage production, Naval Research Logistics Quarterly, vol.2, issue.1-2, pp.59-66, 1956.
DOI : 10.1002/nav.3800030106

C. Stein and J. Wein, On the existence of schedules that are near-optimal for both makespan and total weighted completion time, Operations Research Letters, vol.21, issue.3, pp.115-122, 1997.
DOI : 10.1016/S0167-6377(97)00025-4

G. A. Süer, E. Báez, and Z. Czajkiewicz, Minimizing the number of tardy jobs in identical machine scheduling, Computers and Industrial Engineering, vol.25, pp.1-4, 1993.

T. 'kindt, V. Billaut, and J. C. , Multicriteria Scheduling. Theory, Models and Algorithms, 2006.
URL : https://hal.archives-ouvertes.fr/hal-01048641

T. L. Vincent and W. J. Grantham, Optimality in Parametric Systems, Journal of Applied Mechanics, vol.50, issue.2, 1981.
DOI : 10.1115/1.3167074

L. N. Van-wassenhove and F. Gelders, Solving a bicriterion scheduling problem, European Journal of Operational Research, vol.4, issue.1, pp.281-290, 1980.
DOI : 10.1016/0377-2217(80)90038-7

E. Zitzler, Evolutionary Algorithms for Multiobjective Optimization: Methods and Applications, 1999.

E. Zitzler, M. Laumanns, and L. Thiele, SPEA2: Improving the Strength Pareto Evolutionary Algorithm, 2001.