E. Noreen, . Smith, and J. Mackey, La teoría de las limitaciones y sus consecuencias para la contabilidad de gestión, Ediciones Díaz de Santos S.A. Año de la traducción, 1997.

A. Johnson, MRP? MRP II? OPT? CIM? FMS? JIT? Is any system letter-perfect?, Management Review, vol.75, issue.9, pp.22-27, 1986.

D. S. Koziol, How the constraint theory improved a job-shop operation, Management Accounting, vol.69, issue.11, pp.44-49, 1988.

M. F. Tseng and H. H. Wuz, The study of an Easy-to-Use DBR and BM system, International Journal of Production Research, vol.1, issue.8, pp.1449-1478, 2006.
DOI : 10.1080/00207548808947875

M. L. Ramsay, S. Brown, and K. Tabibzadeh, Push, pull and squeeze shop floor control with computer simulation, Industrial Engineering, vol.22, issue.2, pp.39-45, 1990.

D. P. Cook, A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks, Production and Inventory Management Journal, vol.35, issue.1, pp.73-78, 1994.

K. Duclos and M. S. Spencer, The impact of a constraint buffer in a flow shop, International Journal of Production Economics, vol.42, issue.2, pp.175-185, 1995.
DOI : 10.1016/0925-5273(95)00197-2

J. R. Holt, Candid Comparison of Operational Management Approaches, pp.1-11, 1999.

V. Mabin and S. Balderstone, The World of the Theory of Constraints: A review of the International Literature, 1999.

J. K. Watson, J. H. Balcktone, and S. C. Gardiner, The evolution of a management philosophy: The theory of constraints, Journal of Operations Management, vol.25, issue.2, pp.387-402, 2007.
DOI : 10.1016/j.jom.2006.04.004

R. F. Jacobs, The OPT Scheduling System: A Review of a Production Scheduling System, Production and Inventory Management, p.47, 1983.

M. R. Lambrecht and A. Segaert, Buffer Stock Allocation in Serial and Assembly Type of Production Lines, International Journal of Operations & Production Management, vol.10, issue.3, pp.47-61, 1990.
DOI : 10.1287/opre.36.2.343

S. Raban and R. N. Nagel, Constraint-based control of flexible flow lines, International Journal of Production Research, vol.31, issue.10, pp.1941-1951, 1991.
DOI : 10.1147/rd.294.0401

E. Goldratt, Cadena Crítica (critical chain) : Una novela empresarial sobre la gestión de proyectos, 2001.

L. P. Leach, Critical chain Project Management improves Project performance, Project Management Journal, vol.30, issue.2, p.39, 1999.

M. Umble and E. Umble, Manage your projects for success: an application of the theory of constraints, Production and Inventory Management Journal, vol.41, issue.2, p.27, 2000.

H. Steyn, An investigation into the fundamentals of critical chain project scheduling, International Journal of Project Management, vol.19, issue.6, p.363, 2001.
DOI : 10.1016/S0263-7863(00)00026-0

I. Cohen, A. Mandelbaum, and A. Shutb, Multi-project scheduling and control: a process-based comparative study of the critical chain methodology and some alternatives, Project Management Journal, vol.35, issue.2, pp.39-50, 2004.

L. P. Leach, Lean Project Management, Eight Principles for Success: Combining Critical Chain Project Management and Lean Tools to Accelerate Project Results Advanced Projects Inc. Also available as e-book, 2005.

M. J. Woeppel, Projects in Less Time: A Synopsis of Critical Chain, Pinnacle Strategies, 2006.

S. C. Gardiner, MEASURES OF PRODUCT ATTRACTIVENESS AND THE THEORY OF CONSTRAINTS, International Journal of Retail & Distribution Management, vol.66, issue.3, pp.37-40, 1993.
DOI : 10.1108/09590559310046040

E. Goldratt, No es cuestión de suerte, (It's not luck) Ed, 1995.

S. Rahman, The theory of constraints??? thinking process approach to developing strategies in supply chains, International Journal of Physical Distribution & Logistics Management, vol.32, issue.10, p.809, 2002.
DOI : 10.1016/0098-1354(96)00219-0

K. J. Watson and T. Polito, Comparison of DRP and TOC financial performance within a multi-product, multi-echelon physical distribution environment, International Journal of Production Research, vol.35, issue.4, pp.741-765, 2003.
DOI : 10.1016/0925-5273(94)90173-2

T. M. Simatupang, A. C. Wright, and R. Sridharan, Applying the theory of Constraints to supply chain collaboration. Supply Chain Management, An International Journal, vol.9, issue.1, pp.57-70, 2004.

E. Schragenheim and B. Ronen, Buffer Management: a diagnostic tool for production control, Production and Inventory Management Journal, vol.32, issue.2, pp.74-79, 1991.

J. B. Atwater and S. S. Chakraravorty, Using the theory of constraints to guide the implementation of quality improvement projects in manufacturing operations, International Journal of Production Research, vol.4, issue.6, pp.1737-1761, 1995.
DOI : 10.1080/00207549208942967

T. F. Gattiker and L. H. Boyd, A cause-and-effect approach to analyzing continuous improvement at an electronics manufacturing facility, Production and Inventory Management Journal, vol.40, issue.2, pp.26-31, 1999.

H. Debernardo, Boletín sobre la Teoría de las Restricciones, 2000.

M. Dogget, A statistical comparison of three root curse analysis Tools, Journal of Industrial Technology, vol.20, issue.2, pp.2-9, 2004.

T. Rizzo, The Theory of Constraints, 1997.

V. J. Mabin, J. Davies, and S. M. Kim, Applying the TOC thinking process in supply chain management to achieve a strategic level win-win solution " , paper presented at 4th ANZAN Operations Management Symposium, 2006.

P. Servera, P. Quetglas, and M. Horrach, Vols Nous, una experiencia de TOC en el cambio estratégico de una pequeña empresa, 1999.

W. A. Woehr and D. Legart, Unblock the Power of Your Sales Force! Delta T-Selling, 2002.

J. Roff-mars, Reengineering the Sales Process, 2005.

R. B. Chase, N. J. Aquilano, F. Jacobs, and . Robert, Administración de Producción y Operaciones. Manufactura y Servicios, 8ª Edición

R. Cespón, S. Ibarra, and F. Marrero, La selección del sistema de gestión de la producción en empresas manufactureras

E. Goldratt, El Síndrome del pajar (Haystack syndrome), 1994.