La teoría de las limitaciones y sus consecuencias para la contabilidad de gestión, Ediciones Díaz de Santos S.A. Año de la traducción, 1997. ,
MRP? MRP II? OPT? CIM? FMS? JIT? Is any system letter-perfect?, Management Review, vol.75, issue.9, pp.22-27, 1986. ,
How the constraint theory improved a job-shop operation, Management Accounting, vol.69, issue.11, pp.44-49, 1988. ,
The study of an Easy-to-Use DBR and BM system, International Journal of Production Research, vol.1, issue.8, pp.1449-1478, 2006. ,
DOI : 10.1080/00207548808947875
Push, pull and squeeze shop floor control with computer simulation, Industrial Engineering, vol.22, issue.2, pp.39-45, 1990. ,
A simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks, Production and Inventory Management Journal, vol.35, issue.1, pp.73-78, 1994. ,
The impact of a constraint buffer in a flow shop, International Journal of Production Economics, vol.42, issue.2, pp.175-185, 1995. ,
DOI : 10.1016/0925-5273(95)00197-2
Candid Comparison of Operational Management Approaches, pp.1-11, 1999. ,
The World of the Theory of Constraints: A review of the International Literature, 1999. ,
The evolution of a management philosophy: The theory of constraints, Journal of Operations Management, vol.25, issue.2, pp.387-402, 2007. ,
DOI : 10.1016/j.jom.2006.04.004
The OPT Scheduling System: A Review of a Production Scheduling System, Production and Inventory Management, p.47, 1983. ,
Buffer Stock Allocation in Serial and Assembly Type of Production Lines, International Journal of Operations & Production Management, vol.10, issue.3, pp.47-61, 1990. ,
DOI : 10.1287/opre.36.2.343
Constraint-based control of flexible flow lines, International Journal of Production Research, vol.31, issue.10, pp.1941-1951, 1991. ,
DOI : 10.1147/rd.294.0401
Cadena Crítica (critical chain) : Una novela empresarial sobre la gestión de proyectos, 2001. ,
Critical chain Project Management improves Project performance, Project Management Journal, vol.30, issue.2, p.39, 1999. ,
Manage your projects for success: an application of the theory of constraints, Production and Inventory Management Journal, vol.41, issue.2, p.27, 2000. ,
An investigation into the fundamentals of critical chain project scheduling, International Journal of Project Management, vol.19, issue.6, p.363, 2001. ,
DOI : 10.1016/S0263-7863(00)00026-0
Multi-project scheduling and control: a process-based comparative study of the critical chain methodology and some alternatives, Project Management Journal, vol.35, issue.2, pp.39-50, 2004. ,
Lean Project Management, Eight Principles for Success: Combining Critical Chain Project Management and Lean Tools to Accelerate Project Results Advanced Projects Inc. Also available as e-book, 2005. ,
Projects in Less Time: A Synopsis of Critical Chain, Pinnacle Strategies, 2006. ,
MEASURES OF PRODUCT ATTRACTIVENESS AND THE THEORY OF CONSTRAINTS, International Journal of Retail & Distribution Management, vol.66, issue.3, pp.37-40, 1993. ,
DOI : 10.1108/09590559310046040
No es cuestión de suerte, (It's not luck) Ed, 1995. ,
The theory of constraints??? thinking process approach to developing strategies in supply chains, International Journal of Physical Distribution & Logistics Management, vol.32, issue.10, p.809, 2002. ,
DOI : 10.1016/0098-1354(96)00219-0
Comparison of DRP and TOC financial performance within a multi-product, multi-echelon physical distribution environment, International Journal of Production Research, vol.35, issue.4, pp.741-765, 2003. ,
DOI : 10.1016/0925-5273(94)90173-2
Applying the theory of Constraints to supply chain collaboration. Supply Chain Management, An International Journal, vol.9, issue.1, pp.57-70, 2004. ,
Buffer Management: a diagnostic tool for production control, Production and Inventory Management Journal, vol.32, issue.2, pp.74-79, 1991. ,
Using the theory of constraints to guide the implementation of quality improvement projects in manufacturing operations, International Journal of Production Research, vol.4, issue.6, pp.1737-1761, 1995. ,
DOI : 10.1080/00207549208942967
A cause-and-effect approach to analyzing continuous improvement at an electronics manufacturing facility, Production and Inventory Management Journal, vol.40, issue.2, pp.26-31, 1999. ,
Boletín sobre la Teoría de las Restricciones, 2000. ,
A statistical comparison of three root curse analysis Tools, Journal of Industrial Technology, vol.20, issue.2, pp.2-9, 2004. ,
The Theory of Constraints, 1997. ,
Applying the TOC thinking process in supply chain management to achieve a strategic level win-win solution " , paper presented at 4th ANZAN Operations Management Symposium, 2006. ,
Vols Nous, una experiencia de TOC en el cambio estratégico de una pequeña empresa, 1999. ,
Unblock the Power of Your Sales Force! Delta T-Selling, 2002. ,
Reengineering the Sales Process, 2005. ,
Administración de Producción y Operaciones. Manufactura y Servicios, 8ª Edición ,
La selección del sistema de gestión de la producción en empresas manufactureras ,
El Síndrome del pajar (Haystack syndrome), 1994. ,