O. Abouzahir, R. Gautier, and T. Gidel, Pilotage de l'amélioration des process par les coûts de non-qualité. 10 ième, Séminaire CONFERE Juillet, pp.3-4, 2003.

S. W. Chiu, D. C. Gong, and H. M. Wee, Effects of random defective rate and imperfect rework process on economic production quantity model, Japan Journal of Industrial and Applied Mathematics, vol.22, issue.6, pp.375-389, 2004.
DOI : 10.1007/BF03167589

S. W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework, Journal of Scientific and Industrial Research, vol.66, issue.12, p.979, 2007.

S. W. Chiu, K. K. Chen, and J. C. Yang, Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown, Mathematical and Computer Modelling of Dynamical Systems, vol.15, issue.3, pp.255-274, 2009.
DOI : 10.1080/13873950902808602

M. Colledani and T. Tolio, Impact of quality control on production system performance. CIRP Annals-Manufacturing-Technology, pp.453-456, 2006.

A. V. Feigenbaum, Quality control: Principles, practice and administration: An industrial management tool for improving product quality and design and for reducing operating costs and losses, 1951.

D. Garvin, What does product quality really mean. Sloan management review, pp.25-48, 1984.

P. E. Love, H. Li, and P. Mandal, Rework: a symptom of a dysfunctional supply-chain, European Journal of Purchasing & Supply Management, vol.5, issue.1, pp.1-11, 1999.
DOI : 10.1016/S0969-7012(98)00017-3

M. Noyel, P. Thomas, P. Charpentier, A. Thomas, and T. Brault, Implantation of an online quality process monitoring, th International Conference on Industrial Engineering and Systems Management IESM'13, pp.28-30, 2013.
URL : https://hal.archives-ouvertes.fr/hal-00879491

M. Rabiee, M. Zandies, and A. Jafarian, Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristics, International Journal of Production Research, vol.47, issue.24, pp.50-7428, 2012.
DOI : 10.1080/00207543.2011.652747

A. Skidmann and S. Y. Nof, Unitary Manufacturing Cell Design with Random Product Feedback Flow, IIE Transactions, vol.13, issue.12, pp.188-193, 1985.
DOI : 10.1080/07408178508975291

A. Skidmann, P. Schweitzer, and S. Y. Nof, Performance evaluation of a flexible manufacturing cell with random multiproduct feedback flow, International Journal of Production Research, vol.15, issue.6, pp.1171-1184, 1985.
DOI : 10.1080/00207548508904774

A. Thomas and P. Charpentier, Reducing simulation models for scheduling manufacturing facilities, European Journal of Operational Research, vol.161, issue.1, pp.111-125, 2005.
DOI : 10.1016/j.ejor.2003.08.042

A. M. Zargar, Effect of rework strategies on cycle time, Computers & Industrial Engineering, vol.29, issue.1-4, pp.239-243, 1995.
DOI : 10.1016/0360-8352(95)00078-F