A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, vol.168, issue.3, pp.694-715, 2006. ,
DOI : 10.1016/j.ejor.2004.07.023
Assembly line balancing: Which model to use when?, International Journal of Production Economics, vol.111, issue.2, pp.509-528, 2008. ,
DOI : 10.1016/j.ijpe.2007.02.026
A classification of assembly line balancing problems, European Journal of Operational Research, vol.183, issue.2, pp.674-693, 2007. ,
DOI : 10.1016/j.ejor.2006.10.010
A taxonomy of line balancing problems and their solutionapproaches, International Journal of Production Economics, vol.142, issue.2, pp.259-277, 2013. ,
DOI : 10.1016/j.ijpe.2012.10.020
Line balancing in the real world, Presented at the PLM'05 : international conference on product life cycle management, pp.360-370, 2005. ,
Balancing and sequencing of assembly lines (Publications of Darmstadt Technical University, Institute for Business Studies (BWL)), Institute for Business Studies, 1999. ,
Heuristics for the re-balancing of a vehicle assembly line, International Journal of Production Research, vol.5, issue.3, 2011. ,
DOI : 10.1287/mnsc.16.9.593
Reconfiguration of Machining Transfer Lines, Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, Studies in Computational Intelligence, pp.339-353, 2013. ,
DOI : 10.1007/978-3-642-35852-4_22
URL : https://hal.archives-ouvertes.fr/emse-00794556
Two local search approaches for solving reallife car sequencing problems, European Journal of Operational Research, vol.191, 2008. ,
Production scheduling by reachability analysis-a case study, Parallel and Distributed Processing Symposium , 2005. Proceedings. 19th IEEE International, pp.140-140, 2005. ,
Short-Term Scheduling of Multi-Product Batch Plants with Sequence-Dependent Changeovers Using Timed Automata Models, 2010. ,
DOI : 10.1016/S1570-7946(10)28201-9
Design and synthesis of synchronization skeletons using branching time temporal logic, Logics of Programs, pp.52-71, 1982. ,
Allocation de fonctions de commande de systèmes critiques par recherche d'atteignabilité dans un réseau d'automates communicants École normale supérieure de Cachan -ENS Cachan Production Scheduling by Reachability Analysis -A Case Study, Parallel and Distributed Processing Symposium, 2005. Proceedings. 19th IEEE International. Presented at the Parallel and Distributed Processing Symposium, 2005. Proceedings. 19th IEEE International, pp.140-140, 2005. ,
A theory of timed automata, Theoretical Computer Science, vol.126, issue.2, pp.183-235, 1994. ,
DOI : 10.1016/0304-3975(94)90010-8