Optimal Sampling Schemes for Estimating System Reliability by Testing Components???I: Fixed Sample Sizes, Journal of the American Statistical Association, vol.17, issue.346, pp.485-491, 1974. ,
DOI : 10.1037/h0044139
REKAB, « A sampling scheme for reliability estimation, Southwest J. Pure Appl. Math, vol.electronic, issue.2, pp.1-5, 2002. ,
A branch and bound algorithm for designing reliable systems at a minimum cost, Applied Mathematics and Computation, vol.118, issue.2-3, pp.2-3, 2001. ,
DOI : 10.1016/S0096-3003(99)00217-9
Allocation Proportional to Coefficients of Variation When Estimating the Product of Parameters, Journal of the American Statistical Association, vol.80, issue.412, pp.412-1134, 1990. ,
DOI : 10.1080/07474948708836136
A sampling scheme for estimating the reliability of a series system, IEEE Transactions on Reliability, vol.42, issue.2, pp.287-291, 1992. ,
DOI : 10.1109/24.229502
Stage Allocation Scheme for Estimating the Product of Several Means », Stochastic Anal, Appl, vol.18, issue.2, pp.289-298, 2000. ,
Optimality of Fully Sequential Design and Stopping Rule for Myopic Design, Int. J. Math. Comput. Sci, vol.2, issue.1, pp.41-48, 2007. ,
Allocation Schemes for Estimating the Product of Positive Parameters, Journal of the American Statistical Association, vol.75, issue.390, pp.390-449, 1985. ,
DOI : 10.1080/01621459.1985.10478139
Sequential Allocation for an Estimation Problem with Ethical Costs, The Annals of Statistics, vol.18, issue.3, pp.1358-1377, 1990. ,
DOI : 10.1214/aos/1176347754