M. A. Salido, J. Escamilla, F. Barber, A. Giret, D. Tang et al., Energy-aware Parameters in Job-shop Scheduling Problems, GREEN-COPLAS 2013: IJCAI 2013 Workshop on Constraint Reasoning, Planning and Scheduling Problems for a Sustainable Future, pp.44-53, 2013.

M. R. Garey, D. S. Johnson, and R. Seth, The Complexity of Flowshop and Jobshop Scheduling, Mathematics of Operations Research, vol.1, issue.2, pp.117-129, 1976.
DOI : 10.1287/moor.1.2.117

S. Jain and S. Meeran, Deterministic job-shop scheduling: Past, present and future, European Journal of Operational Research, vol.113, issue.2, pp.390-434, 1999.
DOI : 10.1016/S0377-2217(98)00113-1

L. Gao, D. Zhang, L. Zhang, and X. Li, An efficient memetic algorithm for solving the job shop scheduling problem, Computers & Industrial Engineering, vol.60, issue.4, pp.699-705, 2011.
DOI : 10.1016/j.cie.2011.01.003

M. Chassaing, J. Fontanel, P. Lacomme, L. Ren, N. Tchernev et al., A GRASP??ELS approach for the job-shop with a web service paradigm packaging, Expert Systems with Applications, vol.41, issue.2, pp.544-562, 2014.
DOI : 10.1016/j.eswa.2013.07.080

Y. He, F. Lui, H. J. Cao, and C. Li, A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan, Journal of Central South University of Technology, vol.31, issue.12, pp.167-171, 2005.
DOI : 10.1007/s11771-005-0033-x

Y. Liu, H. Dong, N. Lohse, S. Petrovic, and N. Gindy, An investigation into minimising total energy consumption and total weighted tardiness in job shops, Journal of Cleaner Production, vol.65, pp.87-96, 2014.
DOI : 10.1016/j.jclepro.2013.07.060

M. B. Yildirim and G. Mouzon, Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm, IEEE Transactions on Engineering Management, vol.59, issue.4, pp.585-597, 2011.
DOI : 10.1109/TEM.2011.2171055

K. Fang, N. Uhan, F. Zhao, and J. Sutherland, Flow shop scheduling with peak power consumption constraints, Annals of Operations Research, vol.6, issue.2, pp.115-145, 2013.
DOI : 10.1007/s10479-012-1294-z

H. Luo, G. Huang, H. Chen, and X. Li, Hybrid flow shop scheduling considering machine electricity consumption cost, International Journal of Production Economics, vol.146, issue.2, pp.423-439, 2013.
DOI : 10.1016/j.ijpe.2013.01.028

A. A. Bruzzone, D. Anghinolfi, M. Paolucci, and F. Tonelli, Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops, CIRP Annals - Manufacturing Technology, vol.61, issue.1, pp.459-62, 2012.
DOI : 10.1016/j.cirp.2012.03.084

C. Prins, A GRASP x evolutionary local search hybrid for the vehicle routing problem (eds).: Bio-inspired algorithms for the vehicle routing problem, Studies in computational intelligence, vol.61, pp.35-53, 2009.

T. A. Feo and M. G. Resende, A probabilistic heuristic for a computationally difficult set covering problem, Operations Research Letters, vol.8, issue.2, pp.67-71, 1989.
DOI : 10.1016/0167-6377(89)90002-3

T. A. Feo and M. G. Resende, Greedy Randomized Adaptive Search Procedures, Journal of Global Optimization, vol.68, issue.2, pp.109-133, 2005.
DOI : 10.1007/BF01096763

T. A. Feo, M. G. Resende, and S. H. Smith, A Greedy Randomized Adaptive Search Procedure for Maximum Independent Set, Operations Research, vol.42, issue.5, pp.860-878, 1994.
DOI : 10.1287/opre.42.5.860

M. G. Resende and C. Ribeiro, Greedy randomized adaptive search procedures ORMS, Handbook of metaheuristics, pp.219-249, 2003.

P. Festa and M. G. Resende, An annotated bibliography of GRASP - Part I: Algorithms, International Transactions in Operational Research, vol.16, issue.1, pp.1-24, 2009.
DOI : 10.1111/j.1475-3995.2009.00663.x

P. Festa and M. G. Resende, An annotated bibliography of GRASP-Part II: Applications, International Transactions in Operational Research, vol.16, issue.2, pp.131-172, 2009.
DOI : 10.1111/j.1475-3995.2009.00664.x

B. Roy and B. Sussmann, Les problèmes d'ordonnancement avec contraintes disjunctive, In : Note DS N°9 bis, 1964.

C. Bierwirth, A generalized permutation approach to job shop scheduling with genetic algorithms, OR Spektrum, vol.38, issue.2-3, pp.87-92, 1995.
DOI : 10.1007/BF01719250

P. J. Van-laarhoven, E. H. Aarts, and J. K. Lenstra, Job Shop Scheduling by Simulated Annealing, Operations Research, vol.40, issue.1, pp.113-125, 1992.
DOI : 10.1287/opre.40.1.113