Energy-aware Parameters in Job-shop Scheduling Problems, GREEN-COPLAS 2013: IJCAI 2013 Workshop on Constraint Reasoning, Planning and Scheduling Problems for a Sustainable Future, pp.44-53, 2013. ,
The Complexity of Flowshop and Jobshop Scheduling, Mathematics of Operations Research, vol.1, issue.2, pp.117-129, 1976. ,
DOI : 10.1287/moor.1.2.117
Deterministic job-shop scheduling: Past, present and future, European Journal of Operational Research, vol.113, issue.2, pp.390-434, 1999. ,
DOI : 10.1016/S0377-2217(98)00113-1
An efficient memetic algorithm for solving the job shop scheduling problem, Computers & Industrial Engineering, vol.60, issue.4, pp.699-705, 2011. ,
DOI : 10.1016/j.cie.2011.01.003
A GRASP??ELS approach for the job-shop with a web service paradigm packaging, Expert Systems with Applications, vol.41, issue.2, pp.544-562, 2014. ,
DOI : 10.1016/j.eswa.2013.07.080
A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan, Journal of Central South University of Technology, vol.31, issue.12, pp.167-171, 2005. ,
DOI : 10.1007/s11771-005-0033-x
An investigation into minimising total energy consumption and total weighted tardiness in job shops, Journal of Cleaner Production, vol.65, pp.87-96, 2014. ,
DOI : 10.1016/j.jclepro.2013.07.060
Single-Machine Sustainable Production Planning to Minimize Total Energy Consumption and Total Completion Time Using a Multiple Objective Genetic Algorithm, IEEE Transactions on Engineering Management, vol.59, issue.4, pp.585-597, 2011. ,
DOI : 10.1109/TEM.2011.2171055
Flow shop scheduling with peak power consumption constraints, Annals of Operations Research, vol.6, issue.2, pp.115-145, 2013. ,
DOI : 10.1007/s10479-012-1294-z
Hybrid flow shop scheduling considering machine electricity consumption cost, International Journal of Production Economics, vol.146, issue.2, pp.423-439, 2013. ,
DOI : 10.1016/j.ijpe.2013.01.028
Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops, CIRP Annals - Manufacturing Technology, vol.61, issue.1, pp.459-62, 2012. ,
DOI : 10.1016/j.cirp.2012.03.084
A GRASP x evolutionary local search hybrid for the vehicle routing problem (eds).: Bio-inspired algorithms for the vehicle routing problem, Studies in computational intelligence, vol.61, pp.35-53, 2009. ,
A probabilistic heuristic for a computationally difficult set covering problem, Operations Research Letters, vol.8, issue.2, pp.67-71, 1989. ,
DOI : 10.1016/0167-6377(89)90002-3
Greedy Randomized Adaptive Search Procedures, Journal of Global Optimization, vol.68, issue.2, pp.109-133, 2005. ,
DOI : 10.1007/BF01096763
A Greedy Randomized Adaptive Search Procedure for Maximum Independent Set, Operations Research, vol.42, issue.5, pp.860-878, 1994. ,
DOI : 10.1287/opre.42.5.860
Greedy randomized adaptive search procedures ORMS, Handbook of metaheuristics, pp.219-249, 2003. ,
An annotated bibliography of GRASP - Part I: Algorithms, International Transactions in Operational Research, vol.16, issue.1, pp.1-24, 2009. ,
DOI : 10.1111/j.1475-3995.2009.00663.x
An annotated bibliography of GRASP-Part II: Applications, International Transactions in Operational Research, vol.16, issue.2, pp.131-172, 2009. ,
DOI : 10.1111/j.1475-3995.2009.00664.x
Les problèmes d'ordonnancement avec contraintes disjunctive, In : Note DS N°9 bis, 1964. ,
A generalized permutation approach to job shop scheduling with genetic algorithms, OR Spektrum, vol.38, issue.2-3, pp.87-92, 1995. ,
DOI : 10.1007/BF01719250
Job Shop Scheduling by Simulated Annealing, Operations Research, vol.40, issue.1, pp.113-125, 1992. ,
DOI : 10.1287/opre.40.1.113