B. Bryton, Balancing of a continuous production line, 1954.

J. Bukchin and M. Tzur, Design of flexible assembly line to minimize equipment cost, IIE Transactions, vol.32, issue.7, pp.585-598, 2000.
DOI : 10.1287/mnsc.34.2.240

K. E. Chong, M. K. Omar, and N. A. Bakar, Solving Assembly Line Balancing Problem using Genetic Algorithm with Heuristics-Treated Initial Population, Proceedings of the World Congress on Engineering, 2008.

A. Corominas, R. Pastor, and J. Plans, Balancing assembly line with skilled and unskilled workers, Omega, vol.36, issue.6, pp.1126-1132, 2008.
DOI : 10.1016/j.omega.2006.03.003

T. R. Hoffman, Assembly Line Balancing with a Precedence Matrix, Management Science, vol.9, issue.4, pp.551-562, 1963.
DOI : 10.1287/mnsc.9.4.551

I. K. Moon, R. Logendran, and J. H. Lee, Integrated assembly line balancing with resource restrictions, International Journal of Production Research, vol.47, issue.19, pp.5525-5541, 2008.
DOI : 10.1080/00207540802089876

P. A. Pinto, D. G. Dannenbring, and B. M. Khumawala, Assembly Line Balancing with Processing Alternatives: An Application, Management Science, vol.29, issue.7, pp.817-830, 1983.
DOI : 10.1287/mnsc.29.7.817

M. E. Salveson, The assembly line balancing problem, The Journal of Industrial Engineering, vol.6, issue.3, pp.18-25, 1955.