S. Soak and S. Lee, A memetic algorithm for the quadratic multiple container packing problem, Applied Intelligence, vol.1, issue.1, pp.119-135, 2012.
DOI : 10.1007/s10489-010-0248-x

M. G. Ippolito, G. Morana, R. Sanseverino, E. Vuinovich, and F. , Ant Colony Search Algorithm for Optimal Strategical Planning of Electrical Distribution Systems Expansion, Applied Intelligence, vol.159, issue.3, pp.139-152, 2005.
DOI : 10.1007/s10489-005-4604-1

A. Lim, J. Lin, and F. Xiao, Particle Swarm Optimization and Hill Climbing for the bandwidth minimization problem, Applied Intelligence, vol.153, issue.1, pp.175-182, 2007.
DOI : 10.1007/s10489-006-0019-x

K. Neumann and J. Zimmermann, Resource levelling for projects with schedule-dependent time windows, European Journal of Operational Research, vol.117, issue.3, pp.591-605, 1999.
DOI : 10.1016/S0377-2217(98)00272-0

T. Hegazy, Optimization of Resource Allocation and Leveling Using Genetic Algorithms, Journal of Construction Engineering and Management, vol.125, issue.3, pp.167-175, 1999.
DOI : 10.1061/(ASCE)0733-9364(1999)125:3(167)

M. A. Younis and B. Saad, Optimal resource leveling of multi-resource projects, Computers & Industrial Engineering, vol.31, issue.1-2, pp.1-4, 1996.
DOI : 10.1016/0360-8352(96)00116-7

M. Elwany, H. Korish, I. , E. Barakat, M. et al., Resource smoothening in repetitive projects, Computers & Industrial Engineering, vol.35, issue.3-4, pp.415-418, 1998.
DOI : 10.1016/S0360-8352(98)00122-3

W. Chan, T. Chua, D. , K. , H. Kannan et al., Construction Resource Scheduling with Genetic Algorithms, Journal of Construction Engineering and Management, vol.122, issue.2, pp.125-132, 1996.
DOI : 10.1061/(ASCE)0733-9364(1996)122:2(125)

J. Geng, Q. Weng, L. , P. Liu, S. et al., An improved ant colony optimization algorithm for nonlinear resource-leveling problems, Computers & Mathematics with Applications, vol.61, issue.8, pp.2300-2305, 2011.
DOI : 10.1016/j.camwa.2010.09.058

A. Burges and J. Killebrew, Variation in activity level in a cyclical arrow diagram, Journal of Industrial Engineering, vol.13, issue.2, pp.76-83, 1962.

R. Galbreath, Computer program for leveling resource usage, J. Constr. Div, vol.91, issue.1, pp.107-124, 1965.

L. Shaffer, . J. Ritter, and W. Mayer, The critical path method, 1965.

J. Wiest, D. Levy, F. , and K. , A Management Guide to PERT/CPM, 1977.

R. Harris and B. , Packing Method for Resource Leveling (Pack), Journal of Construction Engineering and Management, vol.116, issue.2, pp.331-350, 1990.
DOI : 10.1061/(ASCE)0733-9364(1990)116:2(331)

J. Antill, M. Woodhead, R. , and W. , Critical Path Methods in Construction Practice, 1982.

J. Moder, J. Philips, C. , R. Davis, and E. W. , Project Management with CPM, PERT and Precedence Diagramming, 1983.

K. Neumann and J. Zimmermann, Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints, European Journal of Operational Research, vol.127, issue.2, pp.425-443, 2000.
DOI : 10.1016/S0377-2217(99)00498-1

S. Leu, S. Yang, C. , and H. , GA-Based Multicriteria Optimal Model for Construction Scheduling, Journal of Construction Engineering and Management, vol.125, issue.6, pp.420-427, 1999.
DOI : 10.1061/(ASCE)0733-9364(1999)125:6(420)

S. Leu, S. Hung, T. , and H. , An optimal construction resource leveling scheduling simulation model, Canadian Journal of Civil Engineering, vol.29, issue.2, pp.267-275, 2002.
DOI : 10.1139/l02-007

J. Huang, W. Wang, X. , X. Chen, and R. , Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management, Journal of Computers, vol.5, issue.12, pp.1916-1924, 2010.
DOI : 10.4304/jcp.5.12.1916-1924

J. Li and H. , Combination of genetic & ant colony algorithms for multi-project resource leveling problem, pp.643-649, 2010.

L. Zhou, W. Peng, and Z. Zhang, An ant colony system for solving resource leveling problem, International Conference on Intelligent Computation Technology & Automation (ICICTA), China, pp.489-492, 2010.

S. Leu, S. Yang, C. , H. Huang, J. et al., Resource leveling in construction by genetic algorithm-based optimization and its decision support system application, Automation in Construction, vol.10, issue.1, pp.27-41, 2000.
DOI : 10.1016/S0926-5805(99)00011-4

S. Liu, X. Wang, M. , and G. , Genetic algorithm for resource leveling problem in project scheduling, Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, p.24, 2001.

A. Senouci, B. Eldin, N. , and N. , Use of Genetic Algorithms in Resource Scheduling of Construction Projects, Journal of Construction Engineering and Management, vol.130, issue.6, pp.869-877, 2004.
DOI : 10.1061/(ASCE)0733-9364(2004)130:6(869)

Z. Y. Chen, Z. Du, D. Zhou, and H. , Research on the unlimited resource leveling optimization with PSO, Tumu Gongcheng Xuebao/China Civil Engineering Journal, vol.40, pp.93-96, 2007.

X. Guo, N. Li, X. Li, and S. , Multi-resource leveling in multiple projects and vector evaluated particle swarm optimization based on Pareto, Kongzhi yu Juece/Control and Decision, pp.789-793, 2010.

N. Kartam and T. Tongthong, An artificial neural network for resource leveling problems, AI EDAM, vol.12, issue.03, pp.273-287, 1998.
DOI : 10.1017/S0890060498123053

V. Jeetendra, A. Krishnaiah, C. , O. , V. Prashanth et al., Petri Nets for Project Management and Resource Levelling, The International Journal of Advanced Manufacturing Technology, vol.16, issue.7, pp.516-520, 2000.
DOI : 10.1007/s001700070059

K. Raja and S. Kumanan, Resource Leveling Using Petrinet and Memetic Approach, American Journal of Applied Sciences, vol.4, issue.5, pp.317-322, 2007.
DOI : 10.3844/ajassp.2007.317.322

N. Pang, Y. Shi, and Y. You, Resource Leveling Optimization of Network Schedule Based on Particle Swarm Optimization with Constriction Factor, 2008 International Conference on Advanced Computer Theory and Engineering, pp.652-656, 2008.
DOI : 10.1109/ICACTE.2008.124

R. Leachman and C. , Multiple resource leveling in construction systems through variation of activity intensities, Naval Research Logistics Quarterly, vol.6, issue.2, pp.187-198, 1983.
DOI : 10.1002/nav.3800300202

E. Akpan, O. , and P. , Resource smoothing: A cost minimization approach, Production Planning & Control, vol.11, issue.8, pp.775-780, 2000.
DOI : 10.1080/095372800750038373

S. Zhao, Y. Liu, H. Zhao, and R. Zhou, GA-Based Resource Leveling Optimization for Construction Project, 2006 International Conference on Machine Learning and Cybernetics, pp.2363-2367, 2006.
DOI : 10.1109/ICMLC.2006.258726

Y. Xiong, Y. Kuang, and P. , Ant colony optimization algorithm for resource leveling problem of contruction problem Advancement of Construction Management and Real Estate, The CRIOCM 2006 International Symposium on, 2006.

J. Roca, E. Pugnaghi, and G. Libert, Solving an Extended Resource Leveling Problem with Multiobjective Evolutionary Algorithms, International Journal of Computational Intelligence, vol.4, pp.289-300, 2008.

K. Anagnostopoulos, P. Kouklinas, and G. , A simulated annealing hyperheuristic for construction resource levelling, Construction Management and Economics, vol.125, issue.1, pp.163-175, 2010.
DOI : 10.1080/01446190903369907

J. Holland and H. , Genetic Algorithms, Scientific American, vol.267, issue.1, pp.66-72, 1992.
DOI : 10.1038/scientificamerican0792-66

J. Kim, K. Kim, N. Jee, and Y. Yoon, Enhanced Resource Leveling Technique for Project Scheduling, Journal of Asian Architecture and Building Engineering, vol.4, issue.2, pp.461-466, 2005.
DOI : 10.3130/jaabe.4.461