S. Hartmann and D. Briskorn, A survey of variants and extensions of the resource-constrained project scheduling problem, European Journal of Operational Research, vol.207, issue.1, pp.1-14, 2010.
DOI : 10.1016/j.ejor.2009.11.005

J. C. Zapata, B. M. Hodge, and G. V. Reklaitis, The multimode resource constrained multiproject scheduling problem: Alternative formulations, AIChE Journal, vol.18, issue.8, pp.2101-2119, 2008.
DOI : 10.1002/aic.11522

O. Koné, C. Artigues, P. Lopez, and M. Mongeau, Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources, Flexible Services and Manufacturing Journal, vol.54, issue.8, pp.25-47, 2013.
DOI : 10.1007/s10696-012-9152-5

A. A. Pritsker, L. J. Waiters, and P. M. Wolfe, Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach, Management Science, vol.16, issue.1, pp.93-108, 1969.
DOI : 10.1287/mnsc.16.1.93

R. Klein and A. Scholl, Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling, European Journal of Operational Research, vol.112, issue.2, pp.322-346, 1999.
DOI : 10.1016/S0377-2217(97)00442-6

E. L. Lawler, Combinatorial optimization: networks and matroids, 1976.

M. Sabzehparvar and S. M. Seyed-hosseini, A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags, The Journal of Supercomputing, vol.28, issue.3, pp.257-273, 2007.
DOI : 10.1007/s11227-007-0158-9

W. Herroelen and R. Leus, Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, vol.165, issue.2, pp.289-306, 2005.
DOI : 10.1016/j.ejor.2004.04.002

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.475.8863

J. Alcaraz, C. Maroto, and R. Ruiz, Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms, Journal of the Operational Research Society, vol.31, issue.6, pp.614-626, 2003.
DOI : 10.1080/00207549308956882

O. Koné, C. Artigues, P. Lopez, and M. Mongeau, Event-based MILP models for resource-constrained project scheduling problems, Computers & Operations Research, vol.38, issue.1, pp.3-13, 2011.
DOI : 10.1016/j.cor.2009.12.011

J. Pinto and I. Grossmann, A continuous time MILP model for short term scheduling of batch plants with pre-ordering constraints, Computers & Chemical Engineering, vol.20, pp.1197-1202, 1996.
DOI : 10.1016/0098-1354(96)00207-4

L. Jr and H. W. , Integer programming with a fixed number of variables, Mathematics of operations research, vol.8, issue.4, pp.538-548, 1983.

U. Be?ikçi, Ü. Bilge, and G. Ulusoy, Different resource management policies in multimode resource constrained multi-project scheduling, World Congress on Engineering and Technology, 2011.

F. B. Talbot, Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case, Management Science, vol.28, issue.10, pp.1197-1210, 1982.
DOI : 10.1287/mnsc.28.10.1197

R. Kolisch, A. Sprecher, and A. Drexl, Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems, Management Science, vol.41, issue.10, pp.41-1693, 1995.
DOI : 10.1287/mnsc.41.10.1693