Long term production planning of open pit mines by ant colony optimization, 2014. ,
Askari-Nasab Hooman and Deutsch Clayton V: A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile, 2014. ,
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contratcts, OREBODY MODELLING AND STRATEGIC MINE PLANNING SYMPOSIUM Novembre, pp.24-26, 2014. ,
Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand, Journal of the Operational Research Society, vol.24, issue.10, 2012. ,
DOI : 10.1016/S0305-0548(97)00008-7
Integration of real options into short-term mine planning and production scheduling, 2009. ,
A Review of Operations Research in Mine Planning, Interfaces, vol.40, issue.3, pp.222-245, 2010. ,
DOI : 10.1287/inte.1090.0492
Using chance constrained binary integer programming in optimising long term production scheduling for open pit mine design, Mining Technology, vol.58, issue.633, pp.58-66, 2007. ,
DOI : 10.2307/1910956
Open Pit Optimization ? Strategies of Improving Economics of Mining Projects through Mine Planning, 2001. ,
Stochastic optimization model for open pit mine planning: application and risk analysis at copper deposit, 2007. ,
Strogies: A continuous framework for open mine planning, 2010. ,
Awuah-Offei: Opem pit optimisation using discounted economic block values, 2009. ,
Stochastic optimization of Mineral Value Chains - Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty, OREBODY MODELLING AND STRATEGIC MINE PLANNING SYMPOSIUM Novembre, pp.24-26, 2014. ,
Multi-period mine planning with multi-process routes, International Journal of Mining Science and Technology, vol.23, issue.3, 2013. ,
DOI : 10.1016/j.ijmst.2013.05.001