A. Arditi and D. Ongkasuwan, Duties and Responsibilities of Construction Managers: Perceptions of Parties Involved in Construction, Journal of Construction Engineering and Management, vol.135, issue.12, pp.1370-1374, 2009.
DOI : 10.1061/(ASCE)CO.1943-7862.0000115

M. Fisher and J. Kunz, THE SCOPE AND ROLE OF INFORMATION TECHNOLOGY IN CONSTRUCTION, Doboku Gakkai Ronbunshu, issue.763, 2004.
DOI : 10.2208/jscej.2004.763_1

C. Haltenhoff and E. , The CM contracting system, pp.128-140, 1998.

S. Staub-frenc, M. Fischer, J. Kunz, and B. Paulson, A generic feature-driven activity-based cost estimation process, Advanced Engineering Informatics, vol.17, issue.1, pp.243-254, 2003.
DOI : 10.1016/S1474-0346(03)00017-X

H. A. Gabbar, A. Aoyama, and Y. Naka, Model-based computer-aided design environment for operational design, Computers & Industrial Engineering, vol.46, issue.3, pp.413-430, 2004.
DOI : 10.1016/j.cie.2004.01.004

X. Zhang, N. Bakis, T. C. Lukins, Y. M. Ibrahim, S. Wu et al., Automating progress measurement of construction projects, Automation in Construction, vol.18, issue.3, pp.294-301, 2009.
DOI : 10.1016/j.autcon.2008.09.004

B. Hardin, BIM and construction management Proven tools, methods, and workflows, pp.176-177, 2009.

V. Popov, V. Juocevicius, D. Migilinskas, L. Ustinovichius, and S. Mikalauskas, The use of a virtual building design and construction model for developing an effective project concept in 5D environment, Automation in Construction, vol.19, issue.3, pp.357-367, 2010.
DOI : 10.1016/j.autcon.2009.12.005

J. Underwood and U. Isikdag, Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies, 2010.
DOI : 10.4018/978-1-60566-928-1

A. N. Baldwin, A. Thorpe, and C. Carter, The use of electronic information exchange on construction alliance projects, Automation in Construction, vol.8, issue.6, pp.651-662, 1999.
DOI : 10.1016/S0926-5805(98)00110-1

R. Navon and O. Berkovich, Development and On-Site Evaluation of an Automated Materials Management and Control Model, Journal of Construction Engineering and Management, vol.131, issue.12, pp.1328-1336, 2005.
DOI : 10.1061/(ASCE)0733-9364(2005)131:12(1328)

C. Hendrickson, Project management for construction, Fundamental concepts for owners, engineers, architects and builders, 2008.

A. Mahalingham, R. Kashyap, and C. Mahajan, An evaluation of the applicability of 4D CAD on construction projects, Automation in Construction, vol.19, issue.2, pp.148-159, 2010.
DOI : 10.1016/j.autcon.2009.11.015

J. Zhang, M. Anson, and Q. Wang, A new 4D management approach to construction planning and site space utilization, 8th International Conference on Computing in Civil and Building Engineering, pp.14-17, 2000.

B. Akinci, M. Fischer, J. Kunz, and R. Levitt, Representing Work Spaces Generically in Construction Method Models. Working Paper #57, 2000.
DOI : 10.1061/(asce)0733-9364(2002)128:4(296)

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.90.51

N. Dawood, D. Scott, E. Sriprasert, and Z. Mallasi, The virtual construction site (VIRCON) tools: an industrial evaluation, Journal of Information Technology in Construction, pp.43-54, 2005.

E. Sriprasert and N. Dawood, Genetic algorithms for multi-constraint scheduling: an application for the construction industry, Proceedings of CIB w78 Conference 2003, 2003.

A. D. Russel, C. Y. Chiu, and T. Korde, Visual representation of construction management data. Automation in Construction, pp.1045-1062, 2009.

K. Song, S. N. Pollalis, and F. Pena-mora, Project Dashboard: Concurrent Visual Representation Method of Project Metrics on 3D Building Models, Computing in Civil Engineering (2005), pp.147-153, 2005.
DOI : 10.1061/40794(179)147

I. K. Brilakis, L. Soibelman, and Y. Shinagawa, Construction site image retrieval based on material cluster recognition, Advanced Engineering Informatics, vol.20, issue.4, pp.443-452, 2006.
DOI : 10.1016/j.aei.2006.03.001

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.105.4572

H. Kim, C. T. Haas, and A. F. Rauch, 3D Image Segmentation of Aggregates from Laser Profiling, Computer-Aided Civil and Infrastructure Engineering, vol.119, issue.7, pp.254-263, 2003.
DOI : 10.1016/S0031-3203(97)00145-3

B. Akinci, F. Boukamp, C. Gordon, D. Huber, C. Lyons et al., A formalism for utilization of sensor systems and integrated project models for active construction quality control, Automation in Construction, vol.15, issue.2, pp.124-138, 2006.
DOI : 10.1016/j.autcon.2005.01.008

N. C. Babic, P. Podbreznik, and D. Rebolj, Integrating resource production and construction using BIM, Automation in Construction, vol.19, issue.5, pp.539-543, 2010.
DOI : 10.1016/j.autcon.2009.11.005

W. A-n-g, H. J. Z-h-a-n-g, J. P. , and K. W. , A n s o n , M . : 4 D d y n a m i c m a n a g e m e n t f o r construction planning and resource utilization, Automation in Construction, vol.13, issue.5, pp.575-589, 2004.

H. An, S. H. Kim, D. Y. , H. Jang, and W. S. , A web-based in teg rated sy stem fo r international project risk management, Automation in Construction, vol.17, issue.3, pp.342-356, 2008.

K. Sulavinki, K. Kahkonen, T. Makela, and M. Kiviniemi, 4D-BIM for construction safety planning, 2010.

O. A. Jannadi and M. S. Bu-khamsin, Safety factors considered by industrial contractors in Saudi Arabia, Building and Environment, vol.37, issue.5, pp.539-547, 2002.
DOI : 10.1016/S0360-1323(01)00056-7

M. Alshawi, J. Goulding, and W. Nadim, Training and education for open building manufacturing: Closing the skills gap. ManuBuild in collaboration with VTT ? Technical Research Centre of Finland, Finland, pp.6-10, 2007.

B. Vacharapoom and B. Sdhabbon, An integrated safety management with construction management using 4D CAD model, Safety Science, vol.48, issue.3, pp.395-403, 2009.

Z. Hu, J. Zhang, and Z. Deng, Construction process simulation and safety analysis based on building information model and 4D technology, Tsinghua Science and Technology, vol.13, issue.S1, pp.266-272, 2008.
DOI : 10.1016/S1007-0214(08)70160-3

B. Koo and M. Fischer, Feasibility Study of 4D CAD in Commercial Construction, Journal of Construction Engineering and Management, vol.126, issue.4, pp.251-260, 2000.
DOI : 10.1061/(ASCE)0733-9364(2000)126:4(251)

C. W. Feng, Y. J. Chen, and J. H. Huang, Using the MD CAD model to develop the time???cost integrated schedule for construction projects, Automation in Construction, vol.19, issue.3, pp.347-356, 2010.
DOI : 10.1016/j.autcon.2009.12.009

B. Koo, M. Fischer, and J. Kunz, A formal identidication and re-sequencing process of location-based scheduling and 4D CAD. Automation in Construction, pp.189-198, 2007.

N. Dawood, A. Akinsola, and B. Hobbs, Development of automated communication of system for managing site information using internet technology, Automation in Construction, vol.11, issue.5, pp.557-572, 2002.
DOI : 10.1016/S0926-5805(01)00066-8

K. W. Chau, M. Anson, and J. P. Zhang, 4D dynamic construction management and visualization software: 1. development. Automation in Construction, pp.512-514, 2005.
DOI : 10.1016/j.autcon.2004.11.002

D. Migilinskas and L. Ustinovichius, Computer-Aided Modelling, Evaluation and Management of Construction Projects According to PLM Concept, Lecture Notes in Computer Science, vol.4101, pp.242-250, 2006.
DOI : 10.1007/11863649_30