P. Fattahi, N. Tavakoli, A. Jalilvand-nejad, and F. Jolai, A hybrid algorithm to solve the problem of re-entrant manufacturing system scheduling, CIRP Journal of Manufacturing Science and Technology, vol.3, issue.4, pp.175-197, 2011.
DOI : 10.1016/j.cirpj.2011.01.001

M. P. Groover, Automation, production systems, and computer integrated manufacturing, 2003.

E. Kutanoglu and I. Sabuncuoglu, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives, International Journal of Production Research, vol.37, issue.1, pp.165-187, 1999.
DOI : 10.1080/002075499191995

G. Neubert and M. Savino, Flow shop operator scheduling through constraint satisfaction and constraint optimisation techniques, International Journal of Productivity and Quality Management, vol.4, issue.5/6, pp.549-568, 2009.
DOI : 10.1504/IJPQM.2009.025185

Y. Ouzrout, M. M. Savino, and A. Mazza, PLM maturity model: A multicriteria assessment in southern Italy companies, International Journal of Operations and Quantitative Management, vol.18, issue.3, pp.160-177, 2012.
URL : https://hal.archives-ouvertes.fr/hal-01355988

M. L. Pinedo, Planning and scheduling in manufacturing and services, 2005.
DOI : 10.1007/978-1-4419-0910-7

M. M. Savino, A. Brun, and C. Riccio, Integrated system for maintenance and safety management through FMECA principles and fuzzy inference engine, European J. of Industrial Engineering, vol.5, issue.2, pp.132-169, 2011.
DOI : 10.1504/EJIE.2011.039870

C. H. Tan, M. Luo, and Y. Zhao, Multi-agent approach for dynamic resource allocation, SIMTech technical reports, Z, 2010.

S. Vinod, Development and analysis of scheduling decision rules for a dynamic flexible job shop production system: a simulation study, International Journal of Business Performance Management, vol.11, issue.1/2, pp.43-71, 2009.
DOI : 10.1504/IJBPM.2009.023800

M. M. Wong, M. Luo, M. M. Savino, and E. Meoli, Dynamic batch scheduling in a continuous cycle-constrained production system, International Journal of Services Operations and Informatics, vol.5, issue.4, pp.313-329, 2010.

F. Wang and J. Lin, A Multi-Agent Architecture for Re-entrant Manufacturing Line, IEEE Global Congress on Intelligent Systems, pp.3-10, 2009.

L. Zhou and N. , Simulating the generic job shop as a multi-agent system, International Journal of Intelligent Systems Technologies and Applications, vol.4, issue.1/2, pp.5-33, 2008.
DOI : 10.1504/IJISTA.2008.016357

J. Zoghby, J. Barnes, and J. Hasenbein, Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches, European Journal of Operational Research, vol.167, issue.2, pp.336-348, 2004.
DOI : 10.1016/j.ejor.2004.03.027