Material Requirements Planning, 1975. ,
MRP II?Unlocking America's Productivity Potential, 1981. ,
Money resource planning, MRP-III: the ultimate marriage between business logistics and financial management information systems, Library Albert, 1994. ,
«ERP: A vision of the next-generation MRP II», Computer Integrated Manufacturing, vol.300, issue.2, pp.1-5, 1990. ,
Supply chain management and advanced planning: concepts, models, software and case studies, 2008. ,
Orlicky's Material Requirements Planning 3, 2011. ,
Integer linear programming formulation of the material requirements planning problem, Journal of Optimization Theory and Applications, vol.21, issue.2, pp.217-230, 1981. ,
DOI : 10.1007/BF00934577
Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction, Management Science, vol.29, issue.10, pp.1126-1141, 1983. ,
DOI : 10.1287/mnsc.29.10.1126
A flow-network approach for equilibrium of material requirements planning, International Journal of Production Economics, vol.102, issue.2, pp.317-332, 2006. ,
DOI : 10.1016/j.ijpe.2005.04.002
Optimization of material requirement planning by fuzzy multi-objective linear programming, Proceedings of the Institution of Mechanical Engineers, pp.887-900, 2008. ,
DOI : 10.1243/09544054JEM1014
«Application of fuzzy lead time to a material requirement planning system», Proceedings of the 8th Conference on 8th WSEAS International Conference on Fuzzy Systems, pp.208-213, 2007. ,
Simulation analysis of a multi-item MRP system based on factorial design, Proceedings of the 2009 Winter Simulation Conference (WSC), pp.2107-2114, 2009. ,
DOI : 10.1109/WSC.2009.5429655
How to protect against demand and yield risks in MRP systems, International Journal of Production Economics, vol.121, issue.2, pp.474-481, 2009. ,
DOI : 10.1016/j.ijpe.2007.02.005
Reverse MRP under uncertain and imprecise demand, The International Journal of Advanced Manufacturing Technology, vol.157, issue.2, pp.413-424, 2009. ,
DOI : 10.1016/j.fss.2005.05.045
«MRP with flexible constraints: A fuzzy mathematical programming approach», Fuzzy Sets and Systems, pp.74-97, 2006. ,
DOI : 10.1016/j.fss.2005.05.045
«Material Requirement Planning with fuzzy constraints and fuzzy coefficients», Fuzzy Sets and Systems, pp.783-793, 2007. ,
Capacity and material requirement planning modelling by comparing deterministic and fuzzy models, International Journal of Production Research, vol.2, issue.20, pp.5589-5606, 2008. ,
DOI : 10.1016/S0019-9958(65)90241-X
URL : https://hal.archives-ouvertes.fr/hal-00512984
«Application of Fuzzy Programming with Recourse in Material Requirement Planning Problem», in Measuring Technology and Mechatronics Automation, ICMTMA'09. International Conference on, pp.546-549, 2009. ,
Planned lead time optimization in material requirement planning environment for multilevel production systems, Journal of Systems Science and Systems Engineering, vol.19, issue.4, pp.132-155, 2008. ,
DOI : 10.1007/s11518-008-5072-z
Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, vol.19, issue.19, pp.5441-5467, 2008. ,
DOI : 10.1002/nav.3800330419
URL : https://hal.archives-ouvertes.fr/hal-00387671
Optimal time phasing and periodicity for MRP with POQ policy, International Journal of Production Economics, vol.131, issue.1, pp.76-86, 2011. ,
DOI : 10.1016/j.ijpe.2010.04.042
URL : https://hal.archives-ouvertes.fr/emse-00673926
Models for production planning under uncertainty: A review, International Journal of Production Economics, vol.103, issue.1, pp.271-285, 2006. ,
DOI : 10.1016/j.ijpe.2005.09.001
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.452.3717
Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007. ,
DOI : 10.1016/j.arcontrol.2007.02.007
URL : https://hal.archives-ouvertes.fr/emse-00675845
A REVIEW OF MANUFACTURING RESOURCES PLANNING MODELS UNDER DIFFERENT UNCERTAINTIES: STATE-OF-THE-ART AND FUTURE DIRECTIONS, The South African Journal of Industrial Engineering, vol.21, issue.1, 2010. ,
DOI : 10.7166/21-1-63
«Adjusting MRP for dynamic differentiation of identical items for process customisation», Production Planning and Control, pp.616-626, 2008. ,
Material requirements planning with flexible bills-of-material, International Journal of Production Research, vol.21, issue.2, pp.399-415, 2006. ,
DOI : 10.1016/0272-6963(93)90022-H
Critical material planning for TFT-LCD production industry, International Journal of Production Economics, vol.122, issue.2, pp.639-655, 2009. ,
DOI : 10.1016/j.ijpe.2009.05.027
The capacitated lot sizing problem: a review of models and algorithms, Omega, vol.31, issue.5, pp.365-378, 2003. ,
DOI : 10.1016/S0305-0483(03)00059-8
Modeling industrial lot sizing problems: a review, International Journal of Production Research, vol.34, issue.6, pp.1619-1643, 2008. ,
DOI : 10.1287/opre.45.6.894
URL : https://hal.archives-ouvertes.fr/hal-00512940
Capacitated lot-sizing with extensions: a review, 4OR, vol.36, issue.4, pp.61-83, 2008. ,
DOI : 10.1007/s10288-007-0057-1
Dynamic capacitated lot-sizing problems: a classification and review of solution approaches, OR Spectrum, vol.13, issue.2, pp.231-261, 2010. ,
DOI : 10.1007/s00291-008-0150-7
A network flow model for the capacitated lot-sizing problem, Omega, vol.27, issue.2, pp.275-284, 1999. ,
DOI : 10.1016/S0305-0483(98)00045-0
A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures, European Journal of Operational Research, vol.75, issue.2, pp.296-311, 1994. ,
DOI : 10.1016/0377-2217(94)90076-0
Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing, European Journal of Operational Research, vol.94, issue.3, pp.561-581, 1996. ,
DOI : 10.1016/0377-2217(95)00094-1
Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing, OR Spektrum, vol.42, issue.2, pp.87-96, 1997. ,
DOI : 10.1007/BF01545506
Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times, OR Spectrum, vol.19, issue.2, pp.773-785, 2008. ,
DOI : 10.1007/s00291-007-0094-3
Wolsey, «Modelling practical lot-sizing problems as mixed-integer programs», Management Science, pp.993-1007, 2001. ,
DOI : 10.1287/mnsc.47.7.993.9800
URL : http://hdl.handle.net/2078.1/4098
Modeling of period overlapping setup times, European Journal of Operational Research, vol.174, issue.2, pp.874-886, 2006. ,
DOI : 10.1016/j.ejor.2005.03.033
The multi-item capacitated lot-sizing problem with setup times and shortage costs, European Journal of Operational Research, vol.185, issue.3, pp.1351-1374, 2008. ,
DOI : 10.1016/j.ejor.2006.01.053
URL : https://hal.archives-ouvertes.fr/hal-00506261
«The capacitated lot-sizing problem with linked lot sizes», Management Science, pp.1039-1054, 2003. ,
DOI : 10.1287/mnsc.49.8.1039.16406
Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems, Operations Research, vol.55, issue.3, p.490, 2007. ,
DOI : 10.1287/opre.1070.0392
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.158.5676
A heuristic approach for big bucket multi-level production planning problems, European Journal of Operational Research, vol.193, issue.2, pp.396-411, 2009. ,
DOI : 10.1016/j.ejor.2007.11.033
A New Dantzig-Wolfe Reformulation and Branch-and-Price Algorithm for the Capacitated Lot-Sizing Problem with Setup Times, Operations Research, vol.55, issue.5, pp.909-920, 2007. ,
DOI : 10.1287/opre.1070.0404
A lagrangian relaxation approach for supply chain planning with order/setup costs and capacity constraints, Journal of Systems Science and Systems Engineering, vol.100, issue.3, pp.98-110, 2003. ,
DOI : 10.1007/s11518-006-0123-9
Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches, European Journal of Operational Research, vol.177, issue.3, pp.1855-1875, 2007. ,
DOI : 10.1016/j.ejor.2005.12.008
Analysis of solution space-dependent performance of simulated annealing: the case of the multi-level capacitated lot sizing problem, Computers & Operations Research, vol.27, issue.9, pp.895-903, 2000. ,
DOI : 10.1016/S0305-0548(99)00064-7
An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem, International Journal of Production Economics, vol.68, issue.3, pp.319-331, 2000. ,
DOI : 10.1016/S0925-5273(99)00100-0
METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES, Asia-Pacific Journal of Operational Research, vol.35, issue.02, pp.261-286, 2005. ,
DOI : 10.1287/mnsc.5.1.89
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over, Journal of the Operational Research Society, vol.47, issue.2, 2005. ,
DOI : 10.1057/jors.1996.13
«A multi-class multi-level capacitated lot sizing model», 2000. ,
DOI : 10.2307/254215
Heuristic genetic algorithms for general capacitated lot-sizing problems, Computers & Mathematics with Applications, vol.44, issue.1-2, pp.1-2, 2002. ,
DOI : 10.1016/S0898-1221(02)00146-3
URL : http://doi.org/10.1016/s0898-1221(02)00146-3
Genetic algorithm-based integrated production planning considering manufacturing partners, The International Journal of Advanced Manufacturing Technology, vol.40, issue.2, pp.547-556, 2007. ,
DOI : 10.1007/s00170-005-0347-8
A heuristic algorithm for a multi-product dynamic lot-sizing and shipping problem, International Journal of Production Economics, vol.98, issue.2, pp.204-214, 2005. ,
DOI : 10.1016/j.ijpe.2004.05.025
A capacitated material requirements planning model considering delivery constraints: A case study from the automotive industry., 2009 International Conference on Computers & Industrial Engineering, pp.378-383, 2009. ,
DOI : 10.1109/ICCIE.2009.5223806
Economic Lot-Sizing for Integrated Production and Transportation, Operations Research, vol.58, issue.2, pp.428-444, 2010. ,
DOI : 10.1287/opre.1090.0727
Multi-item dynamic lot-sizing with delayed transportation policy, International Journal of Production Economics, vol.131, issue.2, 2011. ,
DOI : 10.1016/j.ijpe.2011.02.004