H. Tempelmeier and M. Derstroff, A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times, Management Science, vol.42, issue.5, pp.738-757, 1996.
DOI : 10.1287/mnsc.42.5.738

L. Ozdamar and G. Barbaroso?lu, An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem, International Journal of Production Economics, vol.68, issue.3, pp.319-331, 2000.
DOI : 10.1016/S0925-5273(99)00100-0

L. Ozdamar and M. Bozyel, The capacitated lot sizing problem with overtime decisions and setup times, IIE Transactions, vol.19, issue.11, pp.1043-1057, 2000.
DOI : 10.1109/64.236477

H. C. Bahl, L. P. Ritzman, and J. N. Gupta, OR Practice???Determining Lot Sizes and Resource Requirements: A Review, Operations Research, vol.35, issue.3, pp.329-345, 1987.
DOI : 10.1287/opre.35.3.329

R. Jans and Z. Degraeve, Modeling industrial lot sizing problems: a review, International Journal of Production Research, vol.34, issue.6, pp.1619-1643, 2008.
DOI : 10.1287/opre.45.6.894

URL : https://hal.archives-ouvertes.fr/hal-00512940

K. R. Baker and . Usa, Introduction to Sequencing and Scheduling, 1974.

G. Barbaroso?lu and L. Özdamar, Analysis of solution space-dependent performance of simulated annealing: the case of the multi-level capacitated lot sizing problem, Computers & Operations Research, vol.27, issue.9, pp.895-903, 2000.
DOI : 10.1016/S0305-0548(99)00064-7

O. Tang, Simulated annealing in lot sizing problems, International Journal of Production Economics, vol.88, issue.2, pp.173-181, 2004.
DOI : 10.1016/j.ijpe.2003.11.006