Integration Alternatives for Ship Designers and Shipyards, IFIP International Conference on Advances in Production Management Systems, pp.309-316, 2011. ,
DOI : 10.1007/978-3-642-33980-6_35
URL : https://hal.archives-ouvertes.fr/hal-01524245
If you can't say " no " , you can't make a promise, Seminario Internacional de Confiabilidade da Petrobras, 2014. ,
Lean Project Planning: Using Lean Principles in Project Planning, International Journal of Construction Project Management, 2014. ,
Lean Project Planning in Shipbuilding, Journal of Ship Production and Design, vol.30, issue.2, pp.79-88, 2014. ,
DOI : 10.5957/JSPD.30.2.130054
Implementation of Lean Project Planning: A Knowledge Transfer Perspective, IFIP International Conference on Advances in Production Management Systems, pp.248-255, 2014. ,
DOI : 10.1007/978-3-662-44733-8_31
URL : https://hal.archives-ouvertes.fr/hal-01387189
The Last Planner System of Production Control, 2000. ,
Earned Value-The Next Generation: A Practical Application for Commercial Projects, Proceedings Project Management Institute, pp.839-843, 1996. ,
Improving Construction Workflowthe Connective Role of Lookahead Planning, Proceedings for the 16th annual conference of the International Group for Lean Construction, pp.635-646, 2008. ,
Is the Earned-value Method an Enemy of Work Flow, Proceedings Eighth Annual Conference of the International Group for Lean Construction, IGLC, 2000. ,
Understanding the Relationship Between Planning Reliability and Schedule Performance: A Case Study, Proc. of 17th Annual Conf. of the Int. Group for Lean Construction (IGLC-17), 2009. ,
Case Study Research: Design and Methods 5th ed, 2014. ,
Engineer-to-order supply chain management: A literature review and research agenda, International Journal of Production Economics, vol.122, issue.2, pp.741-754, 2009. ,
DOI : 10.1016/j.ijpe.2009.07.002
Lookahead Planning: The Missing Link in Production Control, Proc. 5 th Annl. Conf. Intl. Group for Lean Constr, 1997. ,