M. F. Anwar and R. Nagi, Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies, International Journal of Production Research, vol.36, issue.3, pp.653-681, 1998.
DOI : 10.1080/002075498193624

O. T. Baruwa and M. A. Piera, A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Research, vol.2, issue.16, pp.4773-4792, 2016.
DOI : 10.1016/j.artint.2005.12.002

Ü. Bilge and G. Ulusoy, A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS, Operations Research, vol.43, issue.6, pp.1058-1070, 1995.
DOI : 10.1287/opre.43.6.1058

K. Bouibede, M. Lakehal, and A. I. Abdelhakim, A Tabu Search for the Bicriteria Scheduling Problem of Job-Shop with, Blocking, 2016.

A. Caumond, P. Lacomme, and A. Moukrim, An MILP for scheduling problems in an FMS with one vehicle, European Journal of Operational Research, vol.199, issue.3, pp.706-722, 2009.
DOI : 10.1016/j.ejor.2008.03.051

A. Dabah, A. Bendjoudi, and D. El-baz, GPU-Based Two Level Parallel B&B for the Blocking Job Shop Scheduling Problem, 2016 IEEE International Parallel and Distributed Processing Symposium Workshops (IPDPSW), pp.747-755, 2016.
DOI : 10.1109/IPDPSW.2016.14

L. Deroussi and S. Norre, Simultaneous scheduling of machines and vehicles for the flexible job shop problem, International conference on metaheuristics and nature inspired computing, pp.1-2, 2010.

H. Fazlollahtabar and M. Saidi-mehrabad, Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study, Journal of Intelligent & Robotic Systems, vol.29, issue.5, pp.525-545, 2015.
DOI : 10.1080/00207549108930107

H. Fazlollahtabar, M. Saidi-mehrabad, and E. Masehian, Mathematical model for deadlock resolution in multiple AGV scheduling and routing network: a case study, Industrial Robot: An International Journal, vol.3, issue.10, pp.252-26310, 2015.
DOI : 10.1109/ICSMC.2008.4811517

R. L. Graham, E. L. Lawler, and J. K. Lenstra, Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics, vol.5, issue.08, pp.287-32610, 1979.
DOI : 10.1016/S0167-5060(08)70356-X

H. Gröflin and A. Klinkert, A new neighborhood and tabu search for the Blocking Job Shop, Discrete Applied Mathematics, vol.157, issue.17, pp.3643-3655, 2009.
DOI : 10.1016/j.dam.2009.02.020

H. Gröflin, D. N. Pham, and R. Bürgy, The flexible blocking job shop with transfer and set-up times, Journal of Combinatorial Optimization, vol.152, issue.17, pp.121-144, 2011.
DOI : 10.1016/S0377-2217(02)00524-6

G. Optimization and I. , Gurobi Optimizer Reference Manual, 2016.

J. Heger, J. Branke, and T. Hildebrandt, Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up times, International Journal of Production Research, vol.8, issue.03, pp.6812-6824, 2016.
DOI : 10.1080/00207543.2012.756590

S. Knust, Shop scheduling problems with transportation, 1999.

P. Lacomme, M. Larabi, and N. Tchernev, Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles, International Journal of Production Economics, vol.143, issue.1, pp.24-34, 2013.
DOI : 10.1016/j.ijpe.2010.07.012

M. Lakehal, A. Aissani, and K. Bouibede, New algorithm of scheduling based on prioriry rules on machines to solve bi-criteria blocking job shop scheduling problem, 2015 12th International Symposium on Programming and Systems (ISPS), pp.1-8, 2015.
DOI : 10.1109/ISPS.2015.7244978

A. Mascis and D. Pacciarelli, Job-shop scheduling with blocking and no-wait constraints, European Journal of Operational Research, vol.143, issue.3, pp.498-51710, 2002.
DOI : 10.1016/S0377-2217(01)00338-1

H. E. Nouri, O. B. Driss, K. Ghédira, R. Silhavy, R. Senkerik et al., A Classification Schema for the Job Shop Scheduling Problem with Transportation Resources: State-of-the-Art Review Artificial Intelligence Perspectives in Intelligent Systems, pp.1-11, 2016.

J. Poppenborg, S. Knust, and J. Hertzberg, Online scheduling of flexible job-shops with blocking and transportation, European J. of Industrial Engineering, vol.6, issue.4, 2012.
DOI : 10.1504/EJIE.2012.047662

B. Scholz-reiter, J. Heger, and T. Hildebrandt, Analysis of Priority Rule-Based Scheduling in Dual-Resource-Constrained Shop-Floor Scenarios, Machine Learning and Systems Engineering
DOI : 10.1007/978-90-481-9419-3_21

K. Thoben, S. Wiesner, and T. Wuest, ???Industrie 4.0??? and Smart Manufacturing ??? A Review of Research Issues and Application Examples, International Journal of Automation Technology, vol.11, issue.1, pp.4-16, 2017.
DOI : 10.20965/ijat.2017.p0004

G. Ulusoy, F. Sivrikaya-?erifo?lu, and Ü. Bilge, A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles, Computers & Operations Research, vol.24, issue.4, pp.335-35110, 1997.
DOI : 10.1016/S0305-0548(96)00061-5

C. Zeng, J. Tang, and C. Yan, Scheduling of no buffer job shop cells with blocking constraints and automated guided vehicles, Applied Soft Computing, vol.24, pp.1033-1046, 2014.
DOI : 10.1016/j.asoc.2014.08.028

Q. Zhang, H. Manier, and M. Manier, A modified shifting bottleneck heuristic and disjunctive graph for job shop scheduling problems with transportation constraints, International Journal of Production Research, vol.52, issue.4, pp.985-1002, 2013.
DOI : 10.1016/j.cor.2011.10.007

F. Zhao, J. Tang, and J. Wang, An improved particle swarm optimisation with a linearly decreasing disturbance term for flow shop scheduling with limited buffers, International Journal of Computer Integrated Manufacturing, vol.4, issue.5, pp.488-499, 2013.
DOI : 10.1080/09511920903207472