R. D. Meller and K. Y. Gau, The facility layout problem: Recent and emerging trends and perspectives, Journal of Manufacturing Systems, vol.15, issue.5, pp.351-366, 1996.
DOI : 10.1016/0278-6125(96)84198-7

S. Benjaafar, S. S. Heragu, and S. A. Irani, Next Generation Factory Layouts: Research Challenges and Recent Progress, Interfaces, vol.32, issue.6, pp.58-76, 2002.
DOI : 10.1287/inte.32.6.58.6473

URL : http://www.me.umn.edu/labs/ngfl/ngfl.pdf

A. Drira, H. Pierreval, and S. Hajri-gabouj, Facility layout problems: A survey, Annual Reviews in Control, vol.31, issue.2, pp.255-267, 2007.
DOI : 10.1016/j.arcontrol.2007.04.001

E. L. Lawler, The Quadratic Assignment Problem, Management Science, vol.9, issue.4, pp.586-599, 1963.
DOI : 10.1287/mnsc.9.4.586

R. D. Meller, V. Narayanan, and P. H. Vance, Optimal facility layout design, Operations Research Letters, vol.23, issue.3-5, pp.117-127, 1999.
DOI : 10.1016/S0167-6377(98)00024-8

W. C. Cheng and P. Kouvelis, An improved tabu search heuristic for solving facility layout design problems, International Journal of Production Research, vol.19, issue.21, pp.2565-2585, 1996.
DOI : 10.1016/S0167-8191(05)80147-4

L. Chwif, M. R. Barretto, and L. A. Moscato, A solution to the facility layout problem using simulated annealing, Computers in Industry, vol.36, issue.1-2, pp.125-132, 1998.
DOI : 10.1016/S0166-3615(97)00106-1

P. Banerjee and Y. Zhou, Facilities layout design optimization with single loop material flow path configuration, International Journal of Production Research, vol.21, issue.1, pp.183-203, 1995.
DOI : 10.1080/00207549208942917

C. Hicks, A genetic algorithm tool for designing manufacturing facilities in the capital goods industry, International Journal of Production Economics, vol.90, issue.2, pp.199-211, 2004.
DOI : 10.1016/S0925-5273(02)00467-X

Y. Fujihara and H. Osaki, A Facility Layout Method Linked to Production Scheduling., Transactions of the Japan Society of Mechanical Engineers Series C, vol.63, issue.605, pp.293-303, 1997.
DOI : 10.1299/kikaic.63.297

R. Hino and T. Moriwaki, Resource Reallocation Based on Production Scheduling, Journal of the, pp.655-659, 2003.

T. Inagawa, Research on facility layout with production scheduling including transportation time, 2005.

E. Morinaga, Y. Shintome, H. Wakamatsu, and E. Arai, Facility Layout Planning with Continuous Representation Considering Temporal Efficiency, Transactions of the Institute of Systems, Control and Information Engineers, vol.29, issue.9, pp.408-413, 2016.
DOI : 10.5687/iscie.29.408

E. Morinaga, K. Iwasaki, H. Wakamatsu, and E. Arai, A facility layout planning method considering routing and temporal efficiency, 2016 International Symposium on Flexible Automation (ISFA), pp.193-198, 2016.
DOI : 10.1109/ISFA.2016.7790158

G. Moslemipour, T. S. Lee, and D. Rilling, A review of intelligent approaches for designing dynamic and robust layouts in flexible manufacturing systems, The International Journal of Advanced Manufacturing Technology, vol.8, issue.1, pp.11-27, 2012.
DOI : 10.1007/978-94-009-3249-4

M. J. Rosenblatt and H. L. Lee, A robustness approach to facilities design, International Journal of Production Research, vol.14, issue.4, pp.479-486, 1987.
DOI : 10.1080/00207548008919646

P. Kouvelis, A. A. Kurawarwala, and G. J. Gutierrez, Algorithms for robust single and multiple period layout planning for manufacturing systems, European Journal of Operational Research, vol.63, issue.2, pp.287-303, 1992.
DOI : 10.1016/0377-2217(92)90032-5

G. Aiello and M. Enea, Fuzzy approach to the robust facility layout in uncertain production environments, International Journal of Production Research, vol.12, issue.18, pp.4089-4101, 2001.
DOI : 10.1016/0165-0114(78)90029-5

Y. Yoshitomi, H. Ikenoue, T. Takeba, and S. Tomita, GENETIC ALGORITHM IN UNCERTAIN ENVIRONMENTS FOR SOLVING STOCHASTIC PROGRAMMING PROBLEM, Journal of the Operations Research Society of Japan, vol.43, issue.2, pp.266-290, 2000.
DOI : 10.15807/jorsj.43.266