P. F. Cunha and R. M. Mesquita, The Role of Discrete Event Simulation in the Improvement of Manufacturing Systems Performance. Chapter in Balanced Automation Systems II. Implementation challenges for anthropocentric manufacturing, pp.137-145, 1996.

G. Heike, M. Ramulu, E. Sorenson, P. Shanahan, and . Moinzadeh, Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry, International Journal of Production Economics, vol.72, issue.2, pp.103-120, 2001.
DOI : 10.1016/S0925-5273(00)00089-X

W. Herroelen and R. Leus, Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, vol.165, issue.2, pp.289-306, 2005.
DOI : 10.1016/j.ejor.2004.04.002

URL : https://lirias.kuleuven.be/bitstream/123456789/202160/2/or_0225.pdf

M. Jahangirian, T. Eldabi, A. Naseer, L. K. Stergioulas, and T. Young, Simulation in manufacturing and business: A review, European Journal of Operational Research, vol.203, issue.1, pp.1-13, 2010.
DOI : 10.1016/j.ejor.2009.06.004

F. Mas, A. Gómez, J. L. Menéndez, and J. Ríos, Proposal for the Conceptual Design of Aeronautical Final Assembly Lines Based on the Industrial Digital Mock-Up Concept, Product Lifecycle Management for Society. PLM 2013. IFIP Advances in Information and Communication Technology, 2013.
DOI : 10.1007/978-3-642-41501-2_2

URL : https://hal.archives-ouvertes.fr/hal-01461855

F. Mas, R. Arista, M. Oliva, B. Hiebert, I. Gilkerson et al., A Review of PLM Impact on US and EU Aerospace Industry, Procedia Engineering, vol.132, pp.1053-1060, 2015.
DOI : 10.1016/j.proeng.2015.12.595

C. A. Murphy and T. Perera, The definition of simulation and its role within an aerospace company, Simulation Practice and Theory, vol.9, issue.6-8, pp.273-291, 2002.
DOI : 10.1016/S0928-4869(01)00045-3

B. Kadar, A. Pfeiffer, and L. Monostori, Discrete Event Simulation for Supporting Production Planning and Scheduling Decisions in Digital Factories, Proceedings of the 37th CIRP international seminar on manufacturing systems, pp.444-448, 2004.

K. Kempf, R. Uzsoy, . Smith, and K. Gary, Evaluation and comparison of production schedules, Computers in Industry, vol.42, issue.2-3, pp.203-220, 2000.
DOI : 10.1016/S0166-3615(99)00071-8

V. J. Leon, S. Wu, and R. H. Storer, ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPS, IIE Transactions, vol.41, issue.5, pp.32-43, 1994.
DOI : 10.1080/00207548508904739

H. Lu, X. Liu, W. Pang, W. Ye, and B. Wei, Modeling and Simulation of Aircraft Assembly Line Based on Quest, Advanced Materials Research, vol.569, pp.666-669, 2012.
DOI : 10.4028/www.scientific.net/AMR.569.666

D. Noack and O. Rose, A simulation based optimization algorithm for slack reduction and workforce scheduling, 2008 Winter Simulation Conference, 1989.
DOI : 10.1109/WSC.2008.4736293

T. Ziarnetzky, L. Mönch, and A. Biele, Simulation of low-volume mixed model assembly lines: Modeling aspects and case study, Proceedings of the Winter Simulation Conference 2014, pp.2101-2112, 2014.
DOI : 10.1109/WSC.2014.7020055