«Building lifecycle management, Proceedings of the International Conference on Product Lifecycle Management, vol.1113, 2005. ,
«IFC and building lifecycle management,» Automation in construction 18, vol.1, pp.70-78, 2008. ,
DOI : 10.1016/j.autcon.2008.05.001
, «Innovative research projects in the field of Building Lifecycle Management,» in Procedia Engineering, vol.122, 2015.
, «BIM and PLM Associations in Current Literature,» in IFIP International Conference on Product Lifecycle Management, pp.345-357, 2017.
, «Comparing PLM and BIM from the product structure standpoint,» in IFIP International Conference on Product Lifecycle Management, 2016.
, CIRP Annals-Manufacturing Technology, vol.2, pp.695-706, 1993.
Product Lifecycle Management, 2005. ,
, The Devil is in the Details, vol.2, 2016.
Virtually Perfect, LLC, pp.2011-978 ,
Let's sort it out, 2016. ,
, United States of America -Department of Defense, «MIL-HDBK-61A(SE). Military Handbook. Configuration Management Guidance, 2001.
, «Lessons Learned for Better Management of Master Geometry,» in PLM 2013, vol.409, 2013.
21st Century Paradigm for Product Realisation, Product Lifecycle Management, vol.1, 2015. ,
«Strategiee for Product Structures Management in Manufacturing Firms,» in 2000 ASME Design Engineering Technical Conferences, 2000. ,
«The product structure evolution model for maintenance based on finite automation, Advanced Materials Research, pp.3010-3016, 2012. ,
, , 2014.
Seeing the whole value stream, pp.978-979, 2011. ,
«Digital mock-up,» in Concurrent Engineering in the 21st Century, pp.355-388, 2015. ,
Analysis of Standards for Lifecycle Management of Systems for US Army ---a preliminary investigation, 2006. ,
«On the implementation of product model interfaces in CIME.,» in Computer Applications in Production and Engineering, IFIP TC5 International Conference on Computer Applications in Production and Engineering (CAPE '97), 1997. ,
«Computer Integrated Construction. A major STEP forward, Proceedings of ARECDAO 1989, 1989. ,
, Semantic Information Modeling Methodology, Zoetemeer, The Nederlands: Gellish.net, pp.978-979, 2015.
«Product Lifecycle Management Model for Design Information Management in Mechanical Field,» in Interdiscliplinary Design, Proceedings of the 21st CIRP Design Conference, pp.2011-00797992 ,
, «Modelling Concepts for BIM,» in Handbook of research on Building Information Modeling and Construction Informatics. COncepts and Technologies, pp.1-15, 2009.
, , 2016.
, «General AEC reference model (GARM). ISO TC184/SC4, 1988.
Building product models: computer environments, supporting design and construction, 1999. ,
«A generic building product model incorporating building type information, p.28, 1995. ,
DOI : 10.1016/0926-5805(94)00028-l
You and D. Yang, «Deployment of an AEC industry sector product model,» Computer-Aided Design 37, vol.12, pp.1214-1228, 2005. ,
«Product modeling standards for the building and construction industry: past, present and future, Automation in construction, vol.8, issue.3, pp.227-235, 1999. ,
DOI : 10.1016/s0926-5805(98)00073-9
«Basic structure of a proposed building product model, Computer-Aided Design, vol.21, issue.2, pp.71-78, 1989. ,
, «The Digital Evolution of the Construction Industry,» in 2017 COMIT Annual Conference, 2017.
, «Applications of Configuration Management in BIM Models Management during the Construction Phase.,» in icccbe2016, pp.978-982, 2016.
«Configuration management in complex engineering projects, » in Procedia CIRP 11, 2013. ,
, , 1996.