FPTAS for the two identical parallel machine problem with a single operator under the free changing mode, European Journal of Operational Research, vol.256, pp.55-61, 2017. ,
Scheduling of Manufacturing Systems under Dual-Resource Constraints Using Genetic Algorithms, Journal of Manufacturing Systems, vol.19, issue.3, pp.186-201, 2000. ,
Minimizing total flow time for the worker assignment scheduling problem in the identical parallel-machine models, International Journal of Advance Manufacturing Technology, vol.25, pp.1046-1052, 2005. ,
Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machine using genetic algorithms, International Journal of Advance Manufacturing Technology, vol.42, pp.581-594, 2009. ,
A job-shop problem with one additional resource type, Journal of Scheduling, vol.14, pp.225-237, 2011. ,
Flexible Job-Shop Scheduling with Dual-Resource Constraints to Minimize Tardiness Using Genetic Algorithm, IOP Conference Series: Materials Science and Engineering, vol.114, p.12060, 2016. ,
Solving the two identical parallel machine problem with a single operator, Proceedings of 2015 International Conference on Industrial Engineering and System Management (IESM), pp.502-507, 2015. ,
A hybrid genetic algorithm for job sequencing and worker allocation in parallel unrelated machines with sequence-dependent setup times, International Journal of Advance Manufacturing Technology, vol.69, pp.2799-2817, 2013. ,
Machine scheduling problems in production: A tertiary study, Computers & Industrial Engineering, vol.111, pp.403-416, 2017. ,
, Adaption in Natural and Artificial Systems. 1 st, 1992.
Comparison of Performance between Different Selection Strategies on Simple Genetic Algorithms, International Conference on CIMCA-IAWTIC'05, 2005. ,
Genetic Algorithm Performance with Different Selection Strategies in Solving TSP, Proceedings of the World Congress on Engineering, vol.II, 2011. ,
A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem, Journal of Intelligence Manufacturing, vol.28, pp.1269-1283, 2017. ,