J. Veldman and A. Alblas, Managing Design Variety, Process Variety and Engineering Change: A Case Study of Two Capital Good Firms, Research in engineering design, vol.23, issue.4, pp.269-290, 2012.

B. J. Pine, Mass customization: The new frontier in business competition, 1993.

F. Salvador and C. Forza, Configuring Products to Address the Customization-Responsiveness Squeeze: A Survey of Management Issues and Opportunities, International Journal or Production Economics, vol.91, pp.273-291, 2004.

A. Duchi, G. Pourabdollahian, and D. Sili, Motivations and Challenges for Engineer-toOrder Companies Moving Toward Mass Customization, IFIP ADV INF COMM TE, vol.440, pp.320-320, 2014.

B. Christensen and T. D. Brunoe, Product Configuration in the ETO and Capital Goods Industry: A Literature Review and Challenges, 2018.

Y. Kristianto, P. Helo, and R. J. Jiao, A System Level Product Configurator for Engineer-toOrder Supply Chains, Comput. Ind, vol.72, pp.82-82, 2015.

R. F. Lu, T. D. Petersen, and R. L. Storch, Modeling Customized Product Configuration in Large Assembly Manufacturing with Supply-Chain Considerations, International Journal of Flexible Manufacturing Systems, vol.19, issue.4, pp.685-712, 2007.

. Thomas-ditlev-brunoe, Product Family Modelling for Multi Level Configuration, 2007.

Q. Zeng, Staged postponement of committing order specifications, 2007.

K. Czarnecki, S. Helsen, and U. Eisenecker, Staged Configuration using Feature Models, pp.266-283, 2004.

D. Pandey, U. Suman, and A. Ramani, An Effective Requirement Engineering Process Model for Software Development and Requirements Management, pp.287-291, 2010.

R. G. Cooper, Stage-Gate Systems: A New Tool for Managing New Products, Bus. Horiz, vol.33, issue.3, pp.44-54, 1990.