Production Scheduling Requirements to Smart Manufacturing - Inria - Institut national de recherche en sciences et technologies du numérique Accéder directement au contenu
Communication Dans Un Congrès Année : 2019

Production Scheduling Requirements to Smart Manufacturing

Résumé

The production scheduling has attracted a lot of researchers for many years, however most of the approaches are not targeted to deal with real manufacturing environments, and those that are, are very particular for the case study. It is crucial to consider important features related with the factories, such as products and machines characteristics and unexpected disturbances, but also information such as when the parts arrive to the factory and when should be delivered. So, the purpose of this paper is to identify some important characteristics that have been considered independently in a lot of studies and that should be considered together to develop a generic scheduling framework to be used in a real manufacturing environment.
Fichier principal
Vignette du fichier
483289_1_En_19_Chapter.pdf (253.11 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-02295241 , version 1 (24-09-2019)

Licence

Paternité

Identifiants

Citer

Duarte Alemão, André Dionísio Rocha, José Barata. Production Scheduling Requirements to Smart Manufacturing. 10th Doctoral Conference on Computing, Electrical and Industrial Systems (DoCEIS), May 2019, Costa de Caparica, Portugal. pp.227-237, ⟨10.1007/978-3-030-17771-3_19⟩. ⟨hal-02295241⟩
41 Consultations
45 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More