H. Elmaraghy, G. Schuh, and W. Elmaraghy, Product variety management, CIRP Annals, vol.62, issue.2, pp.629-652, 2013.

F. Ferreira, J. Faria, and A. Azevedo, Product lifecycle management in knowledge intensive collaborative environments: An application to automotive industry, International Journal of Information Management, vol.37, issue.1, pp.1474-1487, 2017.

A. Böckenkamp, C. Mertens, and C. Prasse, A Versatile and Scalable Production Planning and Control System for Small Batch Series, Industrial internet of things: Cybermanufacturing systems / Sabina Jaschke, pp.541-559, 2017.

G. Schuh, T. Potente, and C. Thomas, Cyber-Physical Production Management: Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013.

B. Luetkehoff, M. Blum, and M. Schroeter, Self-learning Production Control Using Algorithms of Artificial Intelligence, Data-Rich World, vol.506, pp.299-306, 2017.
URL : https://hal.archives-ouvertes.fr/hal-01674863

B. Luetkehoff, M. Blum, and M. Schroeter, Development of a Collaborative Platform for Closed Loop Production Control, pp.278-285, 2018.
URL : https://hal.archives-ouvertes.fr/hal-02191196

H. Wiendahl, Betriebsorganisation für Ingenieure, 8., überarb. Aufl. Hanser, 2014.

F. Schwartz and S. Voß, Störungsmanagement in der Produktion-Simulationsstudien für ein hybrides Fließfertigungssystem, Zeitschrift für Planung & Unternehmenssteuerung, vol.15, issue.4, pp.427-447, 2004.

K. Opfermann, Kostenoptimale Zuverlässigkeit produktiver Systeme, 1968.

X. Gu, X. Jin, and J. Ni, Manufacturing System Design for Resilience, Procedia CIRP, vol.36, pp.135-140, 2015.

H. Wiendahl, Fertigungsregelung: Logistische Beherrschung von Fertigungsabläufen auf Basis des Trichtermodells, 1997.

T. Wünscher, Störungsmanagement im Entwicklungs-und Herstellungsprozess komplexer, kundenindividueller Produkte, 2010.

V. Stich, M. Schröter, and F. Jordan, Assessment of Counter-Measures for Disturbance Management in Manufacturing Environments, 2017.
URL : https://hal.archives-ouvertes.fr/hal-01666167

P. Burggräf, J. Wagner, and K. Lück, Cost-benefit analysis for disruption prevention in low-volume assembly, Production Engineering, vol.11, issue.3, pp.331-342, 2017.

S. Melouk, B. Fontem, and E. Waymire, Stochastic resource allocation using a predictor-based heuristic for optimization via simulation, Computers & Operations Research, vol.46, pp.38-48, 2014.

D. Krenczyk and M. Olender, Simulation Aided Production Planning and Scheduling Using Game Theory Approach. AMM 809, vol.810, pp.1450-1455, 2015.

P. Burggraef, J. Wagner, and M. Dannapfel, Simulating the benefit of disruption prevention in assembly, Journal of Modelling in Management, 2018.

A. Greenwood, S. Vanguri, and B. Eksioglu, Simulation Optimization Decision Support System for Ship Panel Shop Operations, Proceedings of the Winter Simulation Conference, pp.2078-2086, 2005.

N. Galaske and R. Anderl, Disruption Management for Resilient Processes in Cyber-physical Production Systems, Procedia CIRP, vol.50, pp.442-447, 2016.

J. Kletti, MES -Manufacturing Execution System: Moderne Informationstechnologie Zur Prozessfähigkeit Der Wertschöpfung, 2006.

A. Gachet and P. Haettenschwiler, A Decentralized Approach to Distributed Decision Support Systems, Journal of Decision Systems, vol.12, issue.2, pp.141-158, 2003.

P. Nyhuis, J. Mayer, and T. Kuprat, Die Bedeutung von Industrie 4.0 als Enabler für logistische Modelle, vol.4, pp.79-100, 2014.

J. Meissner, Adaptives Abweichungsmanagement in der, Fertigungssteuerung bei Kleinserien. Dissertation, RWTH-Aachen, 2018.