Modified NSGA-II to Solve Noisy Multiobjective Problems », Genetic and Evolutionary Computation Conference, Lecture Notes in Computer Science, vol.2723, pp.21-27, 2003. ,
Indicator-based multi-objective local search, 2007 IEEE Congress on Evolutionary Computation, pp.3100-3107, 2007. ,
DOI : 10.1109/CEC.2007.4424867
URL : https://hal.archives-ouvertes.fr/hal-00609252
Handling Uncertainty in Indicator-Based Multiobjective Optimization, International Journal of Computational Intelligence Research, vol.2, issue.3, pp.255-272, 2006. ,
DOI : 10.5019/j.ijcir.2006.66
Evolutionary Algorithms for Solving Multi-Objective Optimization Problems, 2002. ,
Scheduling jobs, with exponentially distributed processing times, on two machines of a flow shop, Naval Research Logistics Quarterly, vol.9, issue.1, pp.69-81, 1973. ,
DOI : 10.1002/nav.3800200107
Multi-Objective Optimization using Evolutionary Algorithms, 2001. ,
Searching for Robust Pareto-Optimal Solutions in Multi-objective Optimization, Evolutionary Multi-Criterion Optimization, third International Conference, pp.150-164, 2005. ,
DOI : 10.1007/978-3-540-31880-4_11
Jobshop scheduling with imprecise durations: a fuzzy approach, IEEE Transactions on Fuzzy Systems, vol.5, issue.4, pp.557-569, 1997. ,
DOI : 10.1109/91.649907
An Investigation on Noisy Environments in Evolutionary Multiobjective Optimization, IEEE Transactions on Evolutionary Computation, vol.11, issue.3, pp.354-381, 2007. ,
DOI : 10.1109/TEVC.2006.882428
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Optimization and Approximation in Deterministic Sequencing and Scheduling : A Survey, pp.287-326, 1979. ,
DOI : 10.1016/S0167-5060(08)70356-X
Evaluating the quality of approximations of the non-dominated set, 1998. ,
Evolutionary Multi-objective Ranking with Uncertainty and Noise, Evolutionary Multi-Criterion Optimization, First International Conference, pp.329-343, 1993. ,
DOI : 10.1007/3-540-44719-9_23
A multi-objective genetic local search algorithm and its application to flowshop scheduling, IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), vol.28, issue.3, pp.392-403, 1998. ,
DOI : 10.1109/5326.704576
Evolutionary Optimization in Uncertain Environments???A Survey, IEEE Transactions on Evolutionary Computation, vol.9, issue.3, pp.303-317, 2005. ,
DOI : 10.1109/TEVC.2005.846356
Robust scheduling of a two-machine flow shop with uncertain processing times, IIE Transactions, vol.34, issue.5, pp.5-5, 2000. ,
DOI : 10.1080/07408170008963918
On Johnson's Two-Machine Flow Shop with Random Processing Times, Operations Research, vol.34, issue.1, pp.130-136, 1986. ,
DOI : 10.1287/opre.34.1.130
An Introduction to Multiobjective Metaheuristics for Scheduling and Timetabling, Metaheuristics for Multiobjective Optimisation, pp.91-129, 2004. ,
DOI : 10.1007/978-3-642-17144-4_4
« Optimisation multi-objectif sous incertitude : Application aux problèmes d'ordonnancement de type flow-shop », Master's thesis, 2006. ,
ParadisEO-MOEO: A Framework for Evolutionary Multi-objective Optimization, Evolutionary Multi-Criterion Optimization, Fourth International Conference, pp.386-400, 2007. ,
DOI : 10.1007/978-3-540-70928-2_31
URL : https://hal.archives-ouvertes.fr/inria-00269972
Using second moment information in stochastic scheduling », Recent advances in control and optimization of manufacturing systems, Lecture Notes in Control and Information Sciences, vol.214, pp.99-120, 1996. ,
On a scheduling problem, Journal of the Operations Research Society of Japan, vol.8, pp.32-44, 1965. ,
A multiobjective genetic algorithm for radio network optimization, Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512), pp.317-324, 2000. ,
DOI : 10.1109/CEC.2000.870312
Multiple and bicriteria scheduling: A literature survey, European Journal of Operational Research, vol.81, issue.1, pp.88-104, 1995. ,
DOI : 10.1016/0377-2217(93)E0140-S
Ordonnancement sous conditions changeantes : Comment prendre en compte les variations, aléas, incertitudes sur les données ?, Habilitation à diriger des recherches, 2005. ,
Benchmarks for basic scheduling problems, European Journal of Operational Research, vol.64, issue.2, pp.278-285, 1993. ,
DOI : 10.1016/0377-2217(93)90182-M
URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.9.8802
« A note on sequencing problems with uncertain job times, Journal of the Operations Research Society of Japan, vol.9, pp.93-97, 1967. ,
Front Exploration with Uncertain Objectives, Evolutionary Multi-Criterion Optimization , First International Conference, pp.314-328, 1993. ,
Multicriteria Scheduling -Theory, Models and Algorithms, 2002. ,
URL : https://hal.archives-ouvertes.fr/hal-01067335
A class of hypothesis-test-based genetic algorithms for flow shop scheduling with stochastic processing time, The International Journal of Advanced Manufacturing Technology, vol.12, issue.11-12, pp.11-11, 2005. ,
DOI : 10.1007/s00170-003-1961-y
Individual Comparisons by Ranking Methods, Biometrics Bulletin, vol.1, issue.6, pp.80-83, 1945. ,
DOI : 10.2307/3001968
Indicator-Based Selection in Multiobjective Search, Proceedings of the 8th International Conference on Parallel Problem Solving from Nature (PPSN VIII), pp.832-842, 2004. ,
DOI : 10.1007/978-3-540-30217-9_84
Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach, IEEE Transactions on Evolutionary Computation, vol.3, issue.4, pp.257-271, 1999. ,
DOI : 10.1109/4235.797969
Performance assessment of multiobjective optimizers: an analysis and review, IEEE Transactions on Evolutionary Computation, vol.7, issue.2, pp.2-2, 2003. ,
DOI : 10.1109/TEVC.2003.810758