Joint optimal inventory control and preventive maintenance policy - Inria - Institut national de recherche en sciences et technologies du numérique Accéder directement au contenu
Article Dans Une Revue International Journal of Production Research Année : 2008

Joint optimal inventory control and preventive maintenance policy

Nidhal Rezg
  • Fonction : Auteur
  • PersonId : 9267
  • IdHAL : rezg
  • IdRef : 075082160
Anis Chelbi
  • Fonction : Auteur

Résumé

This paper investigates an integrated strategy of inventory control and preventive maintenance for a randomly failing production unit subject to a minimum required availability level. The production unit is submitted to a maintenance action as soon as it reaches a certain age m or at failure, whichever occurs first. A buffer stock h is built up at time A from the start of a production cycle in order to allow a continuous supply of the subsequent production unit at a constant rate during repair and preventive maintenance actions whose respective durations are random. A mathematical model and a numerical procedure are developed to find simultaneously the optimal values of the three decision variables (m*, h*, A*) which minimize the total average cost per time unit and satisfy the availability constraint.
Fichier non déposé

Dates et versions

inria-00598544 , version 1 (06-06-2011)

Identifiants

Citer

Nidhal Rezg, Sofiene Dellagi, Anis Chelbi. Joint optimal inventory control and preventive maintenance policy. International Journal of Production Research, 2008, 46 (19), pp.5349 - 5365. ⟨10.1080/00207540802273942⟩. ⟨inria-00598544⟩
47 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More