On the Combined Scheduling of Malleable and Rigid Jobs, 16th Symposium on Computer Architecture and High Performance Computing, pp.206-213, 2004. ,
DOI : 10.1109/SBAC-PAD.2004.27
Dynamic Malleability in Iterative MPI Applications, Seventh IEEE International Symposium on Cluster Computing and the Grid (CCGrid '07), pp.591-598, 2007. ,
DOI : 10.1109/CCGRID.2007.45
A framework for dynamic adaptation of parallel components, PARCO, pp.65-72, 2005. ,
URL : https://hal.archives-ouvertes.fr/hal-00498836
Scheduling malleable applications in multicluster systems, 2007. ,
URL : https://hal.archives-ouvertes.fr/hal-00498790
Supporting malleability in parallel architectures with dynamic CPUSETs mapping and dynamic MPI, ICDCN, 2010. ,
URL : https://hal.archives-ouvertes.fr/hal-00690449
ReSHAPE: A Framework for Dynamic Resizing and Scheduling of Homogeneous Applications in a Parallel Environment, 2007 International Conference on Parallel Processing (ICPP 2007), 2007. ,
DOI : 10.1109/ICPP.2007.73
The International Exascale Software Project roadmap, International Journal of High Performance Computing Applications, vol.25, issue.1, pp.3-60, 2011. ,
DOI : 10.1177/1094342010391989
Adaptive particle management in a particle-in-cell code, Journal of Computational Physics, vol.227, issue.1, pp.143-155, 2007. ,
DOI : 10.1016/j.jcp.2007.07.015
Extreme-Scale AMR, 2010 ACM/IEEE International Conference for High Performance Computing, Networking, Storage and Analysis, 2010. ,
DOI : 10.1109/SC.2010.25
Adaptive Mesh Refinement for Multiscale Nonequilibrium Physics, Computing in Science and Engineering, vol.7, issue.3, pp.24-31, 2005. ,
DOI : 10.1109/MCSE.2005.45
in numerical cosmology using adaptive mesh refinement, Proceedings of the 2001 ACM/IEEE conference on Supercomputing (CDROM) , Supercomputing '01, 2001. ,
DOI : 10.1145/582034.582047
Predictive performance and scalability modeling of a large-scale application, Proceedings of the 2001 ACM/IEEE conference on Supercomputing (CDROM) , Supercomputing '01, 2001. ,
DOI : 10.1145/582034.582071
Improving the performance of Uintah: A large-scale adaptive meshing computational framework, 2010 IEEE International Symposium on Parallel & Distributed Processing (IPDPS), 2010. ,
DOI : 10.1109/IPDPS.2010.5470437
Benefits and Drawbacks of Redundant Batch Requests, Journal of Grid Computing, vol.12, issue.11, 2007. ,
DOI : 10.1007/s10723-007-9068-6
Parallel Job Scheduling ??? A Status Report, JSSPP, 2004. ,
DOI : 10.1007/11407522_1
A batch scheduler with high level components, CCGrid 2005. IEEE International Symposium on Cluster Computing and the Grid, 2005., p.506006, 2005. ,
DOI : 10.1109/CCGRID.2005.1558641
URL : https://hal.archives-ouvertes.fr/hal-00005106
Utilization, Predictability, Workloads, and User Runtime Estimates in Scheduling the IBM SP2 with Backfilling, TPDS, vol.12, issue.6, pp.529-543, 2001. ,
Untying RMS from Application Scheduling, 2010. ,
URL : https://hal.archives-ouvertes.fr/inria-00519864
Scheduling Strategies for Cycle Scavenging in Multicluster Grid Systems, 2009 9th IEEE/ACM International Symposium on Cluster Computing and the Grid, pp.12-19, 2009. ,
DOI : 10.1109/CCGRID.2009.46
Toward convergence in job schedulers for parallel supercomputers, JSSPP, 1996. ,
DOI : 10.1007/BFb0022284
Moab workload manager administrator guide, version 6.0.2 Automated and dynamic application accuracy management and resource provisioning in a cloud environment, GRID, pp.33-40, 2010. ,
Lessons learned building a 4096-core cloud HPC supercomputer Available: http://blog.cyclecomputing.com Blue Gene/L torus interconnection network, IBM J. Res. Dev, vol.49, 2005. ,