Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

Anis Chelbi Nidhal Rezg 1 Medhi Radhoui 1
1 COSTEAM - Optimal and secure management of manufacturing systems
Inria Nancy - Grand Est, UPVM - Université Paul Verlaine - Metz
Abstract : Purpose - The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items. Design/methodology/approach - The proposed integrated policy is defined and modeled mathematically. Findings - The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications - The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality- and inventory-related costs is shown through a numerical example. Originality/value - The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory- and quality-related costs.
Type de document :
Article dans une revue
Journal of Quality in Maintenance Engineering, Emerald, 2008, 14 (2), pp.161 - 176
Liste complète des métadonnées

https://hal.inria.fr/inria-00598532
Contributeur : Ist Inria Nancy Grand Est <>
Soumis le : lundi 6 juin 2011 - 16:51:03
Dernière modification le : mardi 27 février 2018 - 15:44:03

Identifiants

  • HAL Id : inria-00598532, version 1

Collections

Citation

Anis Chelbi, Nidhal Rezg, Medhi Radhoui. Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system. Journal of Quality in Maintenance Engineering, Emerald, 2008, 14 (2), pp.161 - 176. 〈inria-00598532〉

Partager

Métriques

Consultations de la notice

56