Skip to Main content Skip to Navigation
Conference papers

Key Performance Indicators for Integrating Maintenance Management and Manufacturing Planning and Control

Abstract : Based on current research and industrial experience, it is found to be a challenge with “silos” where an asset with several disciplines have poor collaboration and result in sub-optimised outcome in production. A structured approach to tackle this situation is through the concept of Integrated Planning (IPL). The purpose of this article is through literature study to identify relevant KPIs within both of the disciplines Manufacturing, Planning & Control (MP&C) and Maintenance Management. As a result, Overall Equipment Effectiveness (OEE) is used in both of the disciplines and throughput time is an essential KPI in MP&C. Finally, a KPI structure which integrates MP&C and Maintenance Management is developed in this article.
Complete list of metadatas

Cited literature [22 references]  Display  Hide  Download

https://hal.archives-ouvertes.fr/hal-01417400
Contributor : Hal Ifip <>
Submitted on : Friday, December 16, 2016 - 3:59:30 PM
Last modification on : Thursday, March 5, 2020 - 4:42:11 PM
Document(s) archivé(s) le : Tuesday, March 21, 2017 - 12:10:07 AM

File

346972_1_En_9_Chapter.pdf
Files produced by the author(s)

Licence


Distributed under a Creative Commons Attribution 4.0 International License

Identifiers

Citation

Harald Rødseth, Jan Strandhagen, Per Schjølberg. Key Performance Indicators for Integrating Maintenance Management and Manufacturing Planning and Control. IFIP International Conference on Advances in Production Management Systems (APMS), Sep 2015, Tokyo, Japan. pp.70-77, ⟨10.1007/978-3-319-22756-6_9⟩. ⟨hal-01417400⟩

Share

Metrics

Record views

215

Files downloads

3349